# 157 Chambers Street, Manhattan

Condominium · 38 units · built c. 1931 · Block 140, Lot 7505.

On Umarelli: https://umarelli.org/nyc/1001407505/157-chambers-street

More construction in Tribeca: https://umarelli.org/nyc/manhattan/tribeca.md

Every lot on block 140: https://umarelli.org/nyc/manhattan/140.md

## Building permits

- Alteration, filed Oct 22, 2026, estimated cost $146K, described as “Interior renovation of existing five-bedroom apartment (apartment #ph-a) on the 17TH floor of a multi-family building. Removal & installation of partial non-load bearing partitions & related finishes, as per drawings. No change in use…”
- Alteration, filed Jun 29, 2026, described as “Facade inspection”
- Alteration, filed Mar 19, 2026, estimated cost $8K, described as “Erect non-load bearing partition to divide commercial space, no change in use, egress or occupancy”
- Alteration, filed Oct 31, 2025, estimated cost $168K, described as “Interior renovation of an apartment Apt 7B at 7TH floor kitchen, new laundry and bathroom renovation. No change of use, egress or occupancy.”
- Alteration, filed Oct 31, 2025, estimated cost $21K, described as “Proposed plumibing fixture replacement interior renovation for apartment 7B.”
- Alteration, filed Aug 1, 2025, estimated cost $111K, described as “Minor interior renovation of apartment 8C: new non-load bearing partitions, fixtures and finishes, no sprinkler or mechanical work. Pl to be filed as a subsequent application. (note total apt sf is 1635, areas of work is 1113 sf)”
- Alteration, filed Apr 16, 2025, estimated cost $1K, described as “Erect illuminated accessory channel letter business wall sign with raceway and mounting rail, no change to use, egress or occupation”
- Alteration, filed Feb 10, 2025, estimated cost $54K, described as “Interior alteration; construct new non-load bearing partitions and finishes.”
- Alteration, filed May 29, 2024, estimated cost $112K, described as “Interior renovation to apartment 7C. New kitchen millwork, counters, appliances and fixtures. Construct select partitions, install and replace doors, new wood flooring and lighting as shown on drawings. No change to use, egress, or…”
- Alteration, filed Apr 25, 2024, estimated cost $15K, described as “Filing for facade repairs as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 19, 2024, estimated cost $4K, described as “Erect illuminated accessory channel letter business wall sign with raceway and mounting rail, no change to use, egress or occupation”
- Alteration, filed Feb 7, 2024, described as “First renewal for SR 22/0935 transfer of old method paper submission to DOB NOW filing M01002287”
- Alteration, filed Dec 29, 2023, estimated cost $43K, described as “Erect non-loadbearing partitions to divide commercial space, construct new toilet rooms, alteration to storefront, construction of ramp to provide accessible entrance.”
- Alteration, filed Dec 5, 2023, estimated cost $12K, described as “Propose plumbing work for bathroom upgrade filed in conjunction with gc job #M00854726-I1. No change of use, egress, or occupancy.”
- Alteration, filed Sep 28, 2023, estimated cost $20K, described as “Propose interior alteration and removal of existing rooms & addition of new bathroom & powder room in a multi-family residential building as per plan. Minor partition work and replacements. No change of use, egress, or occupancy.no change…”
- Alteration, filed May 26, 2022, estimated cost $5K, described as “Installation of temporary overhead protection at adjacent property during bldg alteration, filed sep. Overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed May 16, 2022, estimated cost $25K, described as “Installation of temporary scaffold stair tower as per drawings. Scaffold stair tower shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 31, 2022, estimated cost $15K, described as “Installation of heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 17, 2021, estimated cost $299K, described as “Filing for facade repairs as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 24, 2021, estimated cost $750K, described as “Renovate unit 8A on the 8th floor. Work to include removing and installing new interior non-load bearing partitions, lighting and finish work.”
- Alteration, filed Jun 24, 2021, estimated cost $33K, described as “Plumbing and sprinkler work being filed in conjunction with Alteration at unit 8A on the 8th floor. No change to use, egress or occupancy.”
- Alteration, filed Apr 2, 2018, estimated cost $5K, described as “Installation of pipe scaffold (+/-) 142'-0" long and 12'-0" / 14'-0" / 22'-0"/38'-0" high on roof and 8'-0" long and 65'-0" high stair tower on shed as indicated on plans. There will be no change in the use, egress, or occupancy under this…”
- Alteration, filed Feb 5, 2018, estimated cost $8K, described as “Installation of (+/-)146 l.ft new sidewalk shed as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”

## Property taxes

- Assessment: $13,444,400
- 2026–27 tax: $915,277
- Market value (city estimate): $29,876,444
- Taxable value: $7,580,152
- Assessed land: $1,084,502
- Assessed improvements: $12,359,898
- Condo units with their own tax lots: 40

## Tax breaks

- J-51 exemption, through Jun 30, 2030, about $636,721 a year below the full tax.

## Zoning

C6-3A: floor area ratio 12.06 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 7, 2026: $3,515,000, Apt 8B
- Jun 26, 2026: $13,250,000, Unit PH
- May 1, 2025: $4,600,000, Apt 8C
- Apr 4, 2025: $3,175,000, Apt 7B
- Feb 27, 2024: $6,999,000, Apt 10A
- Dec 11, 2023: $8,650,000, Apt TW17N
- Nov 29, 2023: $5,000,000, Apt COM1, sold with other lots
- Jun 5, 2023: $6,715,000, Apt 9A
- Apr 27, 2022: $1,812,500, Apt 3C
- Apr 5, 2022: $3,504,000, Apt 14B

The 10 most recent of 28 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 157-163 CHAMBERS ST (City Planning P2006M0037): Completed, decided Apr 3, 2006. CERT WITHIN THE TRIBECA MIX-USE THAT PROPOSED WINDOWS &\*FLOOR AREA ARE SUFFICIENT
- 151-157 READE & 161-171 CHAMBERS STS (City Planning P1986M0282): Completed, decided May 22, 1986. TEXT AMENDMNT TO CHANGE COMPANION PIECE TO 860303ZMM

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
