208 West Street, Manhattan
College · built 1980 · Block 142, Lot 50.
Building permits
- Alteration, filed Oct 2, 2026, estimated cost $15K, described as “Reach 1 - Area 16 & 17: Temporarily relocate Lot 50 FDC(s) through the flood barrier wall during FBS construction, maintain standpipe connection and FD access per FC 507.5.1, then return FDC(s) to original location. No change to use,…”
- Alteration, filed Aug 14, 2026, estimated cost $459K, described as “BMCC, Emergency Sewer Repairs at Theatre 1, Removal and replacement of sections of reinforced concrete floor slab, portions of non-load bearing partition wall, interior finishes, and bathroom fixtures.”
- Alteration, filed Aug 6, 2026, estimated cost $14.8M, described as “Reach 1 - FBS scope includes excavation, grading, soil improvement, compaction, erosion control, drainage/utility upgrades, foundation stabilization, and floodwall construction for waterfront resiliency per NYC Code. No change to use,…”
- Alteration, filed Aug 4, 2026, estimated cost $230K, described as “BMCC, Emergency Sewer Repairs at Theatre 1, Remove existing & provide new underground sanitary piping from mens toilet to sewage ejector room. Remove & replace existing plumbing fixtures, associated piping & supports in mens toilet green &…”
- Alteration, filed Jul 7, 2026, estimated cost $9.5M, described as “Filing to implement an upgrade to the building management sys (bms). The bms upgrade includes the installation of new controllers, actuators and control devices and updated sequences of operations for all major and minor equipment types in…”
- Alteration, filed Jun 24, 2026, described as “Inspect existing conditions for telecom upgrade.”
- No Work, filed May 27, 2026, described as “Temporary red carpet tents outside of existing theater for annual Tribeca Film Festival. For invited guests only.”
- Alteration, filed Apr 23, 2026, estimated cost $7.3M, described as “This project has been accepted to the HUB Via Consultation on 9/29/2025. Herewith Filing Renovations to the existing student cafeteria, commons space and meeting rooms as reflected on plans.”
- Alteration, filed Apr 14, 2026, estimated cost $80K, described as “The installation of conduit and control wiring through existing walls to connect to existing Con Ed meter at the Main Campus Building, Manhattan Community College. Will involve firestopping of penetrations. No change of use, egress or…”
- Alteration, filed Sep 22, 2025, estimated cost $815K, described as “BMCC, Cycle 9 related Exterior facade repairs including: Removal & replacement of cracked masonry units, steel lintels and precast concrete sills. Repair of deteriorated concrete. Scraping and painting of existing steel lintels. Masonry…”
- Alteration, filed Sep 3, 2025, estimated cost $625K, described as “Here with Filing for the build-out of a new egress stair (Exit Stair 1) and exterior enclosure as per plans. No change in Use or Occupancy is proposed under this application.”
- No Work, filed May 29, 2025, described as “Temporary red carpet tents outside of existing theater for annual Tribeca Film Festival. For invited guests only.”
- Alteration, filed May 27, 2025, estimated cost $25K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed May 19, 2025, estimated cost $107K, described as “Installation of approximately +/-536LF - 12'W x 14'H and +/- 176 lf - 12'W x 20'H temporary heavy duty sidewalk shed as per plans, for exterior facade repair work. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 3, 2024, estimated cost $5K, described as “Temp. Tent/equip. In courtyard of tribeca performing arts center at 199 chambers st. 09/17/24-09/19/24. Tent/equip. Removed upon event completion. Producer to monitor weather conditions & implement appropriate action. No alteration to…”
- No Work, filed Sep 3, 2024, described as “Tpa for arrivals for "2024 fast company innovation festival" from 09/17/24-09/19/24. Temporary tent, filed under separate application #M01104169, installed in courtyard of tribeca performing arts center located at 199 chambers street.”
- Alteration, filed May 28, 2024, estimated cost $1K, described as “Installation of overhead protection installation in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- No Work, filed May 22, 2024, described as “Temporary red carpet tents outside of existing theater for annual Tribeca Film Festival. For invited guests only.”
- Alteration, filed May 22, 2024, estimated cost $5K, described as “Installation of temp tent and prod equip, no alt to exist structures for Annual Tribeca Film Festival. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion”
- Alteration, filed May 30, 2023, estimated cost $1K, described as “Installation of overhead protection for tribecca film festival in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed May 24, 2023, estimated cost $5K, described as “Installation of temp tent and prod equip, no alt to exist structures for Annual Tribeca Film Festival. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion”
- No Work, filed May 23, 2023, described as “Temporary red carpet tents outside of existing theater. For invited guests only.”
- Alteration, filed Jun 28, 2022, estimated cost $39K, described as “AT&T-Replacement of existing antennas and RRH units with removal of RRH units on the roof. Removal, replacement and retrofit of equip cabinets in the equip room on the roof. All work is in compliance with TPPN 5/98. No change in use,…”
- No Work, filed Jun 3, 2022, described as “Temporary red carpet tents outside of existing theater. For invited guests only.”
- Alteration, filed Jun 3, 2022, estimated cost $5K, described as “Temporary structures consisting of tents and a temporary banner support structure. No change of use, egress or occupancy.”
11 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $116,553,150
- Market value (city estimate)
- $259,007,000
- Taxable value
- $0
- Assessed land
- $30,231,450
- Assessed improvements
- $86,321,700
Zoning
C6-4: floor area ratio 3.48 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.