# 200 Chambers Street, Manhattan

Condominium · 251 units · built 2005 · Block 142, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1001427502/200-chambers-street

More construction in Tribeca: https://umarelli.org/nyc/manhattan/tribeca.md

Every lot on block 142: https://umarelli.org/nyc/manhattan/142.md

## Building permits

- Alteration, filed Oct 9, 2026, estimated cost $838K, described as “Proposed interior ren of existing rest. ren. of existing prep kitchens & proposed new prep kitchen. electrical work, new nonbearing partitions, new walls, floor & ceiling finishes. pl , st , spk & mh work filed under separate or subsequent…”
- Alteration, filed Sep 10, 2026, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy.”
- Alteration, filed Aug 4, 2026, described as “Installation of temporary suspended scaffold equipment. No changes in the egress.”
- Alteration, filed Jun 2, 2026, estimated cost $20K, described as “Interior demolition for Suite A on 1st floor”
- Alteration, filed May 6, 2026, estimated cost $98K, described as “Interior alteration of a 3-bedroom apartment. Kitchen and bathrooms to renovated throughout. Existing interior doors to be replaced in kind throughout. No change in use, occupancy or egress.”
- Alteration, filed Apr 14, 2026, estimated cost $209K, described as “Removal of non bearing partitions, finishes, and flooring. no change in use, egress or occupancy.”
- Alteration, filed Mar 27, 2026, estimated cost $335K, described as “Replace existing a.c units, duct work, diffuses, controls and branches for new restaurant build out. Electical work to be filed. No change, use, egress or occupancy.”
- Alteration, filed Jan 13, 2026, estimated cost $98K, described as “Application filed for non load bearing partitions and related finishes, asper plans . No change in use, egress, occupancy or bulk.”
- Alteration, filed Nov 17, 2025, estimated cost $170K, described as “Interior renovation of apt. #17E. No change of use, egress or occupancy.”
- Alteration, filed Sep 25, 2025, estimated cost $225K, described as “Hereby filing for the interior renovation of unit #18A. No change in use, egress or occupancy.”
- Alteration, filed Apr 11, 2025, estimated cost $43K, described as “Mechanical-related work to facilitatae HVAC alterations in existing lobby. No change in use, egress or occupancy.”
- Alteration, filed Mar 7, 2025, estimated cost $180K, described as “Plumbing-related work to facilitate hot water heater replacement. No change to use, egress or occupancy.”
- Alteration, filed Mar 7, 2025, estimated cost $33K, described as “Mechanical-related work to facilitate hot water heater replacement. No change to use, egress or occupancy.”
- Alteration, filed Sep 11, 2024, estimated cost $292K, described as “Garage repair to include surface preparation and patching of existing concrete slabs”
- Alteration, filed Aug 8, 2024, estimated cost $20K, described as “Minor partition work in apartment 8G”
- Alteration, filed Aug 5, 2024, described as “Window inspection via industrial rope access”
- Alteration, filed Jun 11, 2024, estimated cost $68K, described as “Minor interior renovation of an existing commercial space. Remove all interior finishes on the main space as per plans, drop ceilings, floors, non structural walls. No change in use, egress or occupancy”
- Alteration, filed Jan 11, 2024, estimated cost $600K, described as “Interior renovation of entrance and existing lobby space. No change in use, egress, or occupancy this application.”
- Alteration, filed Aug 29, 2023, estimated cost $12K, described as “Interior renovation to apt 27A filed in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Jul 21, 2023, estimated cost $32K, described as “Structural work for handi-cap lift replacement.”
- Alteration, filed Jun 6, 2023, estimated cost $63K, described as “Support for New Mechanical Equipment on EMR Roof. No change to use, egress or occupancy”
- Alteration, filed Mar 9, 2023, estimated cost $29K, described as “Plumbing related work associated with HVAC System Upgrade. No change to use, egress or occupancy.”
- Alteration, filed Feb 23, 2023, estimated cost $11K, described as “Installation of sign for UrVet Care”
- Alteration, filed Dec 22, 2022, estimated cost $1.1M, described as “HVAC System Upgrade program. No change to use, egress or occupancy.”
- Alteration, filed Nov 4, 2022, estimated cost $50K, described as “Renovation of 3B including combining with apartment 3A. No change of use, egress or occupancy.”

22 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1001427502/200-chambers-street.

## Property taxes

- Assessment: $58,544,489
- 2026–27 tax: $5,963,149
- Market value (city estimate): $130,524,503
- Taxable value: $53,645,189
- Assessed land: $4,261,140
- Assessed improvements: $54,283,349
- Condo units with their own tax lots: 315

## Tax breaks

- Nonprofit exemption (charitable), with no end date, about $371,065 a year below the full tax.
- Co-op and condo abatement, with no end date, a $593,728 credit this tax year.

## Zoning

C6-4: floor area ratio 11.74 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Aug 27, 2026: $4,650,000, Apt 10A
- Jul 2, 2026: $4,090,000, Apt 16A, sold with other lots
- Jun 24, 2026: $2,800,000, Apt 5C
- Jun 15, 2026: $2,700,000, Apt 14G
- Jun 11, 2026: $3,150,000, Apt 8C
- Feb 24, 2026: $5,350,000, Unit PHA, sold with other lots
- Oct 23, 2025: $5,950,000, Apt 7A, sold with other lots
- Aug 27, 2025: $2,250,000, Apt 4D
- Aug 7, 2025: $2,436,500, Apt 17G, sold with other lots
- Jun 16, 2025: $1,300,000, Apt 7U

The 10 most recent of 131 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).

## Board and land use applications

- 200 CHAMBERS ST (City Planning P2004M0356): Completed, decided Dec 7, 2004. Disposition of P/O lot 9 of block 142 in Manhattan for the proposed development of up to a 40-story mixed use development.
- 200 CHAMBERS ST (City Planning P2004M0196): Completed, decided Sep 14, 2004. Applicant seeks disposition of P/O lot 9 of block 142 in Manhattan for the proposed development of up to a 40-story mixed use building.
- THE INDEPENDENT (City Planning P1997M0715): Completed, decided Jun 12, 1997. NEW-UNENCLOSED SIDEWALK CAFE WITH 21 SEATS

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
