55 Hudson Street, Manhattan
Co-op · 45 units · built c. 1891 · Block 143, Lot 4.
Building permits
- Alteration, filed Mar 23, 2026, estimated cost $168K, described as “Renovations to apt 5C as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 1, 2025, estimated cost $900K, described as “The Washington Market School. Interior renovations as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 27, 2024, estimated cost $111K, described as “Interior renovation of apartment 6E on the 6TH floor. No change in use, egress, or occupancy.”
- Alteration, filed May 10, 2024, estimated cost $42K, described as “Exterior work proposed for an existing residential apartment. A new bulkhead and window replacement proposed. No change to use, occupancy or egress under this application.”
- Alteration, filed Dec 14, 2023, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Dec 13, 2023, described as “Change in hoist detail”
- Alteration, filed Mar 8, 2023, estimated cost $80K, described as “Mechanical work to existing Apt. # 10BC. Replacing Split Heat-Pump Condensing units at roof. Installing new Split Heat Pump Evaporator units, Exhaust Fans, Electric Floor Warming & Grille/Diffusers. No change to egress, occupancy, or use.”
- Alteration, filed Jan 25, 2023, estimated cost $20K, described as “Replacement of new bathroom fixtures, shower, bath tub,toilets, lavatories, and kitchen sink, provided new two standpipe one for washer and other of indirect waste.”
- Alteration, filed Jan 25, 2023, estimated cost $11K, described as “Installation of new ac unit, with all duct distribution and air outlets, new bath exhaust grille and ductwork with fire dampersnew kitchen exhaust duct and connection to existing”
- Alteration, filed Jan 24, 2023, estimated cost $39K, described as “Replace and or relocate existing plumbing fixtures with new on existing roughing. Replace 2 WC's, 2Lavs, 1sink, 1washer,1dryer(electric),1DW, replacen1tub with shower, replace 1 shower with tub, replace and relocate gas range”
- Alteration, filed Jan 24, 2023, estimated cost $30K, described as “Installing 2.5 ton HVAC condenser, air handler and associated piping.”
- Alteration, filed Jan 24, 2023, estimated cost $40K, described as “Demolition and installation of interior partitions, new through wall sleeve for AC condenser, patch and paint as required.”
- Alteration, filed Jan 8, 2023, estimated cost $250K, described as “Existing apt. # 10BC, erect minor interior partitions and new finishes. No change in egress, occupancy or use.”
- Alteration, filed Dec 14, 2022, estimated cost $176K, described as “Apartment full renovation at eighth floor (apt 8D). No change in use, egress, or occupancy proposed under this application.”
- Alteration, filed May 20, 2021, estimated cost $29K, described as “8th Cycle Facade Repairs to include removal/replacement of defective brickwork, terra cotta sections and defective missing elements of cast iron at lintels. No Change to Use, Egress, or Occupancy.”
- Alteration, filed Oct 1, 2020, estimated cost $21K, described as “Relocate, replace, remove and install pl fixtures in apt#9c. all as per plans.”
- Alteration, filed Jul 14, 2020, estimated cost $15K, described as “Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2014 building codes chapter 33. No changes in use, egress, or occupancy.”
Property taxes
- Assessment
- $13,464,000
- 2026–27 tax
- $1,350,541
- Market value (city estimate)
- $29,920,000
- Taxable value
- $12,706,480
- Assessed land
- $1,926,000
- Assessed improvements
- $11,538,000
Tax breaks
- Co-op and condo abatement, with no end date, a $230,026 credit this tax year.
Zoning
C6-2A: floor area ratio 10.32 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.
Recent sales
- Apr 7, 2026: $5,250,000
- Jan 23, 2026: $2,280,000
- Jun 8, 2023: $1,999,000
- Nov 1, 2022: $5,201,500
- Aug 31, 2022: $2,175,000
- Aug 11, 2022: $4,850,000
- Feb 23, 2022: $1,900,000
- Jan 7, 2022: $2,575,000
- Dec 10, 2021: $1,812,500
- May 24, 2021: $1,875,000
The 10 most recent of 14 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Tribeca West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- IVORY SEA HORSE REST (City Planning P1985M1317): Completed, decided Apr 3, 1986. CONSENT-ENCLOSED SIDEWALK CAFE
- 55 HUDSON ST (City Planning P1981M0981): Completed, decided Dec 2, 1981. CERT PURS(ZR111-202)(B)TO*MODIFY(ZR111-111)(B)(3)&(ZR111-111(B)(5)TO CONVERT BLDG