# 55 Hudson Street, Manhattan

Co-op · 45 units · built c. 1891 · Block 143, Lot 4.

On Umarelli: https://umarelli.org/nyc/1001430004/55-hudson-street

More construction in Tribeca: https://umarelli.org/nyc/manhattan/tribeca.md

Every lot on block 143: https://umarelli.org/nyc/manhattan/143.md

## Building permits

- Alteration, filed Mar 23, 2026, estimated cost $168K, described as “Renovations to apt 5C as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 1, 2025, estimated cost $900K, described as “The Washington Market School. Interior renovations as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 27, 2024, estimated cost $111K, described as “Interior renovation of apartment 6E on the 6TH floor. No change in use, egress, or occupancy.”
- Alteration, filed May 10, 2024, estimated cost $42K, described as “Exterior work proposed for an existing residential apartment. A new bulkhead and window replacement proposed. No change to use, occupancy or egress under this application.”
- Alteration, filed Dec 14, 2023, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Dec 13, 2023, described as “Change in hoist detail”
- Alteration, filed Mar 8, 2023, estimated cost $80K, described as “Mechanical work to existing Apt. # 10BC. Replacing Split Heat-Pump Condensing units at roof. Installing new Split Heat Pump Evaporator units, Exhaust Fans, Electric Floor Warming & Grille/Diffusers. No change to egress, occupancy, or use.”
- Alteration, filed Jan 25, 2023, estimated cost $20K, described as “Replacement of new bathroom fixtures, shower, bath tub,toilets, lavatories, and kitchen sink, provided new two standpipe one for washer and other of indirect waste.”
- Alteration, filed Jan 25, 2023, estimated cost $11K, described as “Installation of new ac unit, with all duct distribution and air outlets, new bath exhaust grille and ductwork with fire dampersnew kitchen exhaust duct and connection to existing”
- Alteration, filed Jan 24, 2023, estimated cost $39K, described as “Replace and or relocate existing plumbing fixtures with new on existing roughing. Replace 2 WC's, 2Lavs, 1sink, 1washer,1dryer(electric),1DW, replacen1tub with shower, replace 1 shower with tub, replace and relocate gas range”
- Alteration, filed Jan 24, 2023, estimated cost $30K, described as “Installing 2.5 ton HVAC condenser, air handler and associated piping.”
- Alteration, filed Jan 24, 2023, estimated cost $40K, described as “Demolition and installation of interior partitions, new through wall sleeve for AC condenser, patch and paint as required.”
- Alteration, filed Jan 8, 2023, estimated cost $250K, described as “Existing apt. # 10BC, erect minor interior partitions and new finishes. No change in egress, occupancy or use.”
- Alteration, filed Dec 14, 2022, estimated cost $176K, described as “Apartment full renovation at eighth floor (apt 8D). No change in use, egress, or occupancy proposed under this application.”
- Alteration, filed May 20, 2021, estimated cost $29K, described as “8th Cycle Facade Repairs to include removal/replacement of defective brickwork, terra cotta sections and defective missing elements of cast iron at lintels. No Change to Use, Egress, or Occupancy.”
- Alteration, filed Oct 1, 2020, estimated cost $21K, described as “Relocate, replace, remove and install pl fixtures in apt#9c. all as per plans.”
- Alteration, filed Jul 14, 2020, estimated cost $15K, described as “Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2014 building codes chapter 33. No changes in use, egress, or occupancy.”

## Property taxes

- Assessment: $13,464,000
- 2026–27 tax: $1,350,541
- Market value (city estimate): $29,920,000
- Taxable value: $12,706,480
- Assessed land: $1,926,000
- Assessed improvements: $11,538,000

## Tax breaks

- Co-op and condo abatement, with no end date, a $230,026 credit this tax year.

## Zoning

C6-2A: floor area ratio 10.32 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Apr 7, 2026: $5,250,000
- Jan 23, 2026: $2,280,000
- Jun 8, 2023: $1,999,000
- Nov 1, 2022: $5,201,500
- Aug 31, 2022: $2,175,000
- Aug 11, 2022: $4,850,000
- Feb 23, 2022: $1,900,000
- Jan 7, 2022: $2,575,000
- Dec 10, 2021: $1,812,500
- May 24, 2021: $1,875,000

The 10 most recent of 14 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

## Landmarks

Part of Tribeca West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- IVORY SEA HORSE REST (City Planning P1985M1317): Completed, decided Apr 3, 1986. CONSENT-ENCLOSED SIDEWALK CAFE
- 55 HUDSON ST (City Planning P1981M0981): Completed, decided Dec 2, 1981. CERT PURS(ZR111-202)(B)TO\*MODIFY(ZR111-111)(B)(3)&(ZR111-111(B)(5)TO CONVERT BLDG

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
