60 Hudson Street, Manhattan
Commercial · built c. 1930 · Block 144, Lot 40.
Building permits
- Alteration, filed Nov 2, 2026, estimated cost $670K, described as “Interior demo of partitions, ceilings & doors for 13th floor restrooms. No change in use, egress or occupancy.”
- Alteration, filed Sep 16, 2026, estimated cost $100K, described as “Replacement of the fuel oil fill spill containers, fuel oil fill piping and vent piping. No change in use, egress or occupancy.”
- No Work, filed Sep 4, 2026, described as “TPA request for a one day private event at the 8th floor on Monday, 9/14/26 from 2pm to 9pm with 140 person max occupancy and 2 FGs will be present.”
- Alteration, filed Aug 27, 2026, estimated cost $300K, described as “Demo & installation of new sewage ejector pumps as shown on the plans. Existing sewage ejector tank to remain and receive new pressure rated side hatch. No change in use, egress or occupancy.”
- Alteration, filed Aug 20, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jul 9, 2026, estimated cost $250K, described as “Interior construction work as shown on plans filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed Jul 7, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed May 6, 2026, estimated cost $85K, described as “Application filed for replacement of existing watersource heat pump unit serving commercial space. No change in use, egress or occupancy.”
- Alteration, filed May 6, 2026, estimated cost $100K, described as “Replacement of AHU and related piping as shown on plans. No change in use, egress or occupancy.”
- Alteration, filed May 5, 2026, estimated cost $328K, described as “Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed May 5, 2026, estimated cost $775K, described as “Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 19, 2025, estimated cost $276K, described as “Interior construction work as shown on plans filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed Dec 16, 2025, estimated cost $50K, described as “Interior construction work as shown on plans filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed Dec 8, 2025, estimated cost $307K, described as “Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Nov 3, 2025, estimated cost $78K, described as “Interior construction work as shown on plans filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed Oct 14, 2025, estimated cost $249K, described as “Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.”
- No Work, filed Aug 27, 2025, described as “TPA for Private event on September 14th, 2025 from 2pm to 9pm with 190 Occupant Load and 2 FGs to be provided. Bldg is fully Sprinklered.”
- Alteration, filed Jul 18, 2025, described as “Installation of a temporarily construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 8, 2025, estimated cost $600K, described as “Interior construction work as shown on plans filed herewith. No change in use, egress, and occupancy.”
- Alteration, filed May 16, 2025, estimated cost $289K, described as “Replacements of fuel fill lines to existing tanks.”
- Alteration, filed Apr 30, 2025, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 28, 2025, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 27, 2025, estimated cost $750K, described as “Filed to install new emergency generator.”
- Alteration, filed Mar 20, 2025, estimated cost $6K, described as “Installation of temporary work platform per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Mar 19, 2025, described as “Installation of temporary shaft pipe scaffold as per plans. No change in use, egress or occupancy.”
55 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $237,554,550
- 2026–27 tax
- $24,657,081
- Market value (city estimate)
- $527,899,000
- Taxable value
- $227,296,098
- Assessed land
- $13,095,000
- Assessed improvements
- $224,459,550
Zoning
C6-2A: floor area ratio 15.29 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.
Landmarks
Part of Western Union Building: Individual Landmark, Western Union Building (Interior Landmark). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- Appeal (Board of Standards and Appeals 174-05-A): Appeal, Denied, filed Jul 29, 2005, decided Oct 17, 2006. Neighbors against N.O.I.S.E. is appealing the New York City Department of Buildings approval of a conditional variance of the New York City Administrative Code §27-829(b)(1) requirements for fuel oil storage at 60 Hudson Street.
- WESTERN UNION BLDG 1ST FLR INTERIOR (City Planning P1992M0105): Completed, decided Dec 24, 1991. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING*COURSE LA; Additional LPC #(s): 379