# 40 Worth St, Manhattan

Condominium · built c. 1929 · Block 148, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1001487501/40-worth-st

More construction in Civic Center: https://umarelli.org/nyc/manhattan/civic-center.md

Every lot on block 148: https://umarelli.org/nyc/manhattan/148.md

## Building permits

- Alteration, filed Jun 17, 2026, estimated cost $275K, described as “Propose to replace an existing air-cooled AC unit 15-ton with a water-cooled unit 15-ton. No change in use, egress or occupancy.”
- Alteration, filed Mar 11, 2026, estimated cost $622K, described as “Proposed interior non-bearing renovation, with minor partitions and finish work at 03 and 14 floor as per plan. No change in use, egress and occupancy.”
- Alteration, filed Sep 19, 2024, estimated cost $480K, described as “Propose to perform interior renovations. No change to use, egress or occupancy.”
- Alteration, filed Sep 19, 2024, estimated cost $53K, described as “Propose to perform plumbing and sprinkler work. No change to use, egress or occupancy.”
- Alteration, filed Sep 19, 2024, estimated cost $140K, described as “Propose to perform mechanical work. No change to use, egress or occupancy.”
- Alteration, filed Sep 19, 2024, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 16, 2024, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed May 30, 2024, estimated cost $195K, described as “Proposed interior non-bearing renovation, with minor partitions and finish work at 14 and 15 floor as per plan. No change in use, egress and occupancy.”
- Alteration, filed Mar 21, 2024, described as “Installation of suspended scaffold during facade inspection/repair”
- Alteration, filed Jun 7, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 31, 2023, estimated cost $702K, described as “Facade restoration at floors 1 to roof and bulkhead as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Mar 2, 2023, estimated cost $25K, described as “Propose to replace existing entrance doors with new storefront and access ramp. No change in use, egress or occupancy.”
- Alteration, filed Feb 17, 2023, estimated cost $377K, described as “8731- Interior renovation of existing office space for GAP. No change in egress use or occupancy.”
- Alteration, filed Jan 11, 2023, estimated cost $250K, described as “Propose to perform interior renovations (Phase 2). No change in use, egress or occupancy.”
- Alteration, filed Jan 11, 2023, estimated cost $27K, described as “Propose to perform plumbing and sprinkler work. No change in use, egress or occupancy.”
- Alteration, filed Jan 11, 2023, estimated cost $31K, described as “Propose to perform mechanical work. No change in use, egress or occupancy.”
- Alteration, filed Nov 30, 2022, estimated cost $410K, described as “Propose to perform interior renovations. No change to use, egress or occupancy.”
- Alteration, filed Nov 15, 2022, estimated cost $99K, described as “Propose to perform mechanical work. No change to use, egress or occupancy.”
- Alteration, filed Nov 15, 2022, estimated cost $25K, described as “Propose to perform plumbing and sprinkler work. No change to use, egress or occupancy.”
- Alteration, filed Sep 9, 2022, estimated cost $440K, described as “Propose to perform mechanical work (phase 1). No change to use, egress or occupancy.”
- Alteration, filed Sep 7, 2022, estimated cost $370K, described as “Propose to perform mechanical work (phase 2). No change to use, egress or occupancy.”
- Alteration, filed May 10, 2022, estimated cost $11K, described as “Propose to perform sprinkler work (phase 1). No change to use, egress or occupancy.”
- Alteration, filed May 10, 2022, estimated cost $12K, described as “Propose to perform sprinkler work (phase 2). No change to use, egress or occupancy.”
- No Work, filed Mar 4, 2022
- Alteration, filed Jan 28, 2022, estimated cost $600K, described as “Propose to perform plumbing and sprinkler work (Phase 1). No change to use, egress or occupancy.”

31 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1001487501/40-worth-st.

## Property taxes

- Assessment: $77,522,406
- 2026–27 tax: $5,353,934
- Market value (city estimate): $172,272,005
- Taxable value: $54,690,681
- Assessed land: $6,795,002
- Assessed improvements: $70,727,404
- Condo units with their own tax lots: 24

## Tax breaks

- Nonprofit exemption (charitable), with no end date, about $2,185,711 a year below the full tax.

## Zoning

C6-4 (part of the lot is C6-2A): floor area ratio 13.61 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 40 Worth Street - DDC Office Space Lease Renewal (City Planning 2023M0437): Completed, filed Aug 17, 2023, decided Oct 5, 2023. An office space acquisition application pursuant to Section 195 of the New York City Charter to facilitate a lease renewal of approximately 8,683 square feet of office space for continued use by the Department of Design and Construction…