## Building permits

- Alteration, filed May 13, 2026, estimated cost $4.8M, described as “Masonry restoration, roof replacement, sidewalk replacement, lintel replacement, window sill replacement, ramp replacement, new metal railings, concrete repair, terrazzo replacement, and painting. No change to use, egress, or occupancy.”
- Alteration, filed Jan 21, 2026, estimated cost $22K, described as “Plumbing work for elevator modification. No change of use, egress occupancy under this application.”
- Alteration, filed Jan 21, 2026, estimated cost $362K, described as “Mechanical work for elevator modification. No change of use, egress occupancy under this application.”
- Alteration, filed Jan 21, 2026, estimated cost $21.2M, described as “Modernization of existing elevator shaft for new cabs. No change of use, egress, or occupancy under this application”
- Alteration, filed Dec 14, 2025, estimated cost $240K, described as “Boiler #3 burner-boiler replacement.”
- Alteration, filed Oct 1, 2025, estimated cost $149K, described as “Structural work for elevator modification. No change of use, egress occupancy under this application.”
- Alteration, filed Apr 23, 2025, estimated cost $73K, described as “Installation of approximately +/- 584 lf of temporary sidewalk shed, as per plans, for public protection. No change in use, egress and occupancy.”
- Alteration, filed Dec 11, 2024, estimated cost $700K, described as “Toilet renovations at floors 3,5, 10, 12, 15 and 16 to make ADA compliant. No change in Certificate of Occupancy.”
- Alteration, filed Jun 1, 2023, estimated cost $71K, described as “Replacement split system air conditioning units.”
- Alteration, filed Jul 24, 2019, estimated cost $504K, described as “Installation of new mechanical system on the 12th floor west.”
- Alteration, filed Jul 3, 2019, estimated cost $146K, described as “Installation of sprinkler system as shown on plans. No change of use, egress, or occupancy under this application.”

## Property taxes

- Assessment: $41,616,900
- Market value (city estimate): $92,482,000
- Taxable value: $0
- Assessed land: $3,240,000
- Assessed improvements: $38,376,900

## Zoning

C6-4: floor area ratio 21.21 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of African Burial Ground &amp; The Commons Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- C-O-P (City Planning P1997M0366): Completed, decided Nov 13, 1997. UNRESTRICTED DISPOSITION OF A VACANT GROUND FLOOR & BASEMENT
- C-O-P (City Planning P1984M0621): Completed, decided Sep 13, 1984. 10-YR BID LEASE OF ST-LEVEL COMMERCIAL SPACE IN CITY-OWNED\*BLDG, 1 PARCEL
- P1979Y0357 (City Planning P1979Y0357): Completed, decided May 1, 1981. AMEND ZR74-67, SPECIAL PERMIT FOR FIRE OR POLICE STATION
- MCENNA SQ HSES (City Planning P1980M0536): Completed, decided Sep 18, 1980. P&P/LDA-MCKENNA SQ HSES IN WASHINGTON HEIGHTS(ART V, SECT 8\*& 221(D)(4),142 DU'S)