67 Franklin Street, Manhattan
Condominium · 13 units · built c. 1915 · Block 174, Lot 7505.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Aug 11, 2025, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola.”
- Alteration, filed May 19, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- No Work, filed Nov 20, 2023
- Alteration, filed Apr 18, 2023, estimated cost $29K, described as “Filing herewith mechanical work for the building at the address listed. Includes new duct and piping and toilet exhaust systems.mechanical ventilation provided. Refer to ot application drawings (architectural).”
- Alteration, filed Apr 3, 2023, estimated cost $51K, described as “This alteration is being filed for plumbing and sprinkler work in conjunction with DOB #M08022991. Plumbing work includes new water & sewer for bldg., new fixtures.”
- Alteration, filed Feb 3, 2023, estimated cost $55K, described as “This alteration is being filed for structural work in conjunction with M08022991. Work to include the installation of new concrete over metal deck topping slab to provide level floor.”
- Alteration, filed Nov 3, 2022, estimated cost $165K, described as “This alteration is being filed for non structural demolition to cellar and first floor commercial space. No change in use, egress or occupancy.”
- Alteration, filed Oct 4, 2021, estimated cost $20K, described as “Sprinkler and Plumbing work as shown on plans filed herewith.”
- Alteration, filed Jul 16, 2019, estimated cost $8K, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jul 16, 2019, estimated cost $10K, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 29, 2018, estimated cost $9K, described as “Installation of sidewalk shed as per plan.”
Property taxes
- Assessment
- $8,140,501
- 2026–27 tax
- $924,116
- Market value (city estimate)
- $18,089,998
- Taxable value
- $7,535,682
- Assessed land
- $1,323,002
- Assessed improvements
- $6,817,499
- Condo units with their own tax lots
- 14
Zoning
C6-4A (part of the lot is C6-2A): floor area ratio 6.37 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jan 20, 2026: $5,700,000, Apt 4B
- Feb 6, 2025: $11,000,000, Unit PHA
- Apr 28, 2022: $14,250,000, Unit PHB
- Apr 6, 2022: $8,400,000, Apt 6A
- Jan 22, 2021: $5,625,000, Apt 4A
- Jun 27, 2019: $4,300,000, Apt 2C
- Jun 24, 2019: $5,575,000, Apt 2D
- May 21, 2019: $5,170,000, Apt 2A
- May 10, 2019: $7,900,000, Apt 6B
- Apr 29, 2019: $4,475,000, Apt 2B
The 10 most recent of 15 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of No. 361 Broadway Building (James White Building) (Individual Landmark). 11 Landmarks Preservation Commission permits are on file.