31 North Moore Street, Manhattan
Condominium · 23 units · built c. 1915 · Block 190, Lot 7503.
Building permits
- Alteration, filed May 4, 2026, estimated cost $3.9M, described as “Renovation and combination of two duplex apartments including modification of floor levels for a portion of the plan. No change in use, egress or occupancy.”
- Alteration, filed Apr 11, 2025, estimated cost $325K, described as “Interior renovation as shown on general construction plans to apt 5A”
- Alteration, filed Mar 28, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the NYC building code.live load 300PSF.”
- Alteration, filed Mar 28, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the NYC building code.live load 300PSF.”
- Alteration, filed Feb 3, 2025, estimated cost $185K, described as “Facade restoration as per plans filed. No change in occupancy, use or egress.”
- Alteration, filed Feb 3, 2025, estimated cost $185K, described as “Facade restoration as per plans filed. No change in occupancy, use or egress.”
- Alteration, filed Dec 4, 2024, estimated cost $100K, described as “General construction associated with courtyard waterproofing membrane replacement. No change in occupancy, use or egress.”
- Alteration, filed Mar 7, 2024, estimated cost $125K, described as “Structural work to reinforce existing seventh framing level.”
- Alteration, filed Oct 9, 2023, estimated cost $75K, described as “Hereby filing for the interior renovation of apartment 3B. No change in use, egress or occupancy.”
- Alteration, filed Jun 13, 2023, estimated cost $300K, described as “Replacement (1) new low pressure hot water 4 pass boiler. Replacement (1) new combination gas/oil burner. Straight gas only at this time. No change in means of egress use group or occupancy.”
- Alteration, filed Jun 13, 2023, estimated cost $96K, described as “New gas train. Reconnect existing low pressure gas line. (2) new house circulating pumps. Straight gas only at this time. No change in means of egress use group or occupancy.”
- Alteration, filed Apr 11, 2023, estimated cost $20K, described as “Replace cracked stones at ground floor. No change in use, egress nor occupancy.”
- Alteration, filed Mar 17, 2023, estimated cost $52K, described as “Replace, relocate and install new sprinkler heads.”
- Alteration, filed Mar 17, 2023, estimated cost $90K, described as “Modification of mechanical ductwork.”
- Alteration, filed Mar 17, 2023, estimated cost $81K, described as “Removal, replacement, relocation and installation of new plumbing fixtures.”
- Alteration, filed Mar 16, 2023, estimated cost $1.8M, described as “Removal and installation of interior partitions, flooring and finishes. No change in use, egress or occupancy.”
- Alteration, filed Sep 15, 2022, estimated cost $455K, described as “Interior renovation to existing apartment #4E. Work to include interior non-structural demolition, general construction and related finishes, as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 15, 2022, estimated cost $50K, described as “Demolition of existing plumbing fixtures and sprinkler heads as shown on plans. Installation of replacement fixtures and new sprinkler heads per updated floor layout as shown on plans. Modification of gas piping. No change to use,…”
- Alteration, filed Sep 15, 2022, estimated cost $50K, described as “Installation of outdoor VRF unit on roof and six (6) indoor units with associated refrigerant piping and ductwork with bathroom and kitchen exhaust fans.”
- Alteration, filed Oct 19, 2020, estimated cost $12K, described as “The scope of work consists of installation of new kitchen, addition of powder room, relocation of the washer and dryer closet, replacement of the existing tub with a new shower in the master bathroom, all new fixtures for all bathrooms.”
- Alteration, filed Jun 26, 2019, estimated cost $1K, described as “Installation of pipe scaffolding. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $11,505,168
- 2026–27 tax
- $1,177,347
- Market value (city estimate)
- $25,567,020
- Taxable value
- $10,674,377
- Assessed land
- $1,060,204
- Assessed improvements
- $10,444,964
- Condo units with their own tax lots
- 37
Tax breaks
- Co-op and condo abatement, with no end date, a $124,924 credit this tax year.
Zoning
C6-2A: floor area ratio 6.03 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 8, 2022: $5,850,000, Apt 6A
- Mar 15, 2022: $6,000,000, Apt 4E
- Feb 4, 2022: $4,275,000, Apt 6D
- Nov 12, 2020: $16,400,000, Unit PHA, sold with other lots
- Mar 9, 2018: $300,000, 694 sq ft ($432 per sq ft)
- Mar 8, 2018: $5,450,000, Apt 4C
Open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Tribeca West Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- 35-37 NO MOORE ST (City Planning P1996M0273): Completed, decided Dec 26, 1996. 96DCP041M: CONVERSION OF THE CELLAR BENEATH 35-37 NORTH MOORE STREET TO PROVIDE UP TO 12 PARKING SPACES FOR THE EXCLUSIVE USE OF RE SIDENTS OF THE BUILDING
- 31-33 NORTH MOORE ST (City Planning P1997M0024): Completed, decided Sep 13, 1996. CERTIFICATION TO CONVERT THE 1ST FLR FROM STORAGE TO RETAIL*STORE, CONVERT 2ND FLR FROM STORAGE TO LOFT DWELLING W/IN*THE SPECIAL LOWER MANHATTAN MIXED USE DIST (LMM TRIBECA)
- 35-37 NO. MOORE ST (City Planning P1995M0120): Completed, decided Aug 28, 1995. 95DCP001M: SPECIAL PERMIT TO CONVERT A FIRE DAMAGED & VACANT WAREHOUSE TO APPROX 22 RESD'L UNITS W/COMM'L SPACE ON THE 1ST FLOOR & STORAGE IN THE CELLAR