78 Walker Street, Manhattan
Commercial · built c. 1907 · Block 196, Lot 29.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Mar 2, 2026, estimated cost $35K, described as “Facade repair as noted by NYC DOB inspector”
- Alteration, filed Jun 9, 2025, estimated cost $5K, described as “Installation of a 100 KW Diesel Rooftop Generator.”
- Alteration, filed May 30, 2025, estimated cost $4K, described as “Dunnage to support a generator”
- Alteration, filed Aug 15, 2024, estimated cost $314K, described as “Co alteration”
- Alteration, filed Jun 11, 2024, described as “File-suspended scaffold outrigger systems for facade restoration and inspection.”
- Alteration, filed May 24, 2024, estimated cost $80K, described as “Modification of plumbing and renovation of sprinkler and standpipe system for commercial building in conjunction with gc application #M00949843-I1”
- Alteration, filed Apr 24, 2024, estimated cost $3K, described as “This application is for facade repair and restoration and address the Landmark Violation V 071305LANDMK06-0013”
- Alteration, filed Mar 25, 2024, estimated cost $148K, described as “Modification of plumbing and renovation of sprinkler and standpipe system for a commercial building in conjunction with gc application# M00949843-I1.”
- Alteration, filed Mar 19, 2024, estimated cost $10K, described as “Installation of mechanical system for an 8-story storage building in conjunction with M01094644-I1.”
- Alteration, filed Nov 9, 2023, estimated cost $623K, described as “1. Demolition of existing: flooring, non-bearing partitions, door, frames & finishes. 2. Construction: non-bearing partitions, doors & frames, flooring, bathroom fixtures & finishes.*no change in use, egress and occupancy.*”
- Alteration, filed Nov 9, 2023, estimated cost $312K, described as “1. Demolition of existing: flooring, non-bearing partitions, door, frames & finishes. 2. Construction: non-bearing partitions, doors & frames, flooring, bathroom fixtures & finishes.*no change in use, egress and occupancy.*”
- Alteration, filed Aug 6, 2020, estimated cost $5K, described as “Installation of pipe scaffold as per plans.pipe scaffold shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.”
Property taxes
- Assessment
- $737,550
- 2026–27 tax
- $76,563
- Market value (city estimate)
- $1,639,000
- Taxable value
- $705,780
- Assessed land
- $409,500
- Assessed improvements
- $328,050
Zoning
M1-5: floor area ratio 9.05 built, above the 5.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Tribeca East Historic District (Historic District). 22 Landmarks Preservation Commission permits are on file.