## Building permits

- Alteration, filed Jun 2, 2025, estimated cost $85K, described as “Interior renovation of existing space to deli store. Remove and install partition walls, finishing floor, walls and ceiling as per plans. No change in egress, occupancy or use is involved under this application.”
- Alteration, filed Mar 18, 2025, estimated cost $3K, described as “Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 4, 2025, described as “Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 27, 2024, estimated cost $160K, described as “Filing Application for Minor Facade Renovation and Repairs.”
- Alteration, filed Jun 5, 2024, estimated cost $25K, described as “Proposed mechanical work on first floor. No change in use, egress or occupancy.”
- Alteration, filed Apr 18, 2024, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 16, 2024, estimated cost $100K, described as “Non- Structural exterior wall removal and infill as shown on drawings filed herewith. No change in use, egress, or occupancy under this application. Application is in relation to adjacent building, 124 White Street, Full DM #123916487,…”
- Alteration, filed Jan 11, 2024, estimated cost $100K, described as “Plumbing modifications associated with the interior renovation of exam rooms and toilet rooms and as indicated on the plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Nov 20, 2023, estimated cost $2.0M, described as “Interior refurbishment of the existing medical clinic as indicated on the plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 27, 2023, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 23, 2023, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 23, 2023, estimated cost $132K, described as “Install new HVAC system on 2ND floor, 3RD floor and low roof. Mechanical work as per plan. No change in egress, use or occupancy”
- Alteration, filed Dec 13, 2022, estimated cost $320K, described as “Installation of roof protection as shown on drawings filed herewith. No change in use, egress, or occupancy under this application. Application is in relation to adjacent building, 124 White Street, full demolition #123916487, (PMM)…”
- Alteration, filed Sep 7, 2022, estimated cost $225K, described as “Interior renovation of existing retail as per c.o. #108955 for new interior partitions lighting and finishes. No change in use, egress or occupancy.”
- Alteration, filed Jun 16, 2022, estimated cost $750, described as “Non-illuminated non-advertising accessory wall sign - rx metropharm inc. No change of use, egress or occupancy.”
- Alteration, filed Feb 24, 2022, estimated cost $35K, described as “Proposed minor interior demolition, no change in use, egress or occupancy.”
- Alteration, filed Sep 7, 2021, estimated cost $43K, described as “Interior renovation with re-tile existing floor and install new counters and shelves on 1ST floor and mezzanine drug store/ pharmacy. No change of use, egress or occupancy.”
- Alteration, filed Aug 26, 2021, estimated cost $20K, described as “To provide one line of vertical shoring from cellar slab to joist, reinforcing building structure; partition and mechanical work on a commerical space on 001 floor as per plan filed herewith. No change of use, egress or certificate of…”
- Alteration, filed Jun 25, 2021, estimated cost $418K, described as “Structural work and new rooftop steel dunnage as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 15, 2021, estimated cost $2.1M, described as “Window removal and replacement. Through wall ac sleeve removal and infill, new mechanical shafts. New 13TH fl solarium as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 27, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”

## Property taxes

- Assessment: $13,569,750
- Market value (city estimate): $30,155,000
- Taxable value: $0
- Assessed land: $873,000
- Assessed improvements: $12,696,750

## Zoning

C6-4: floor area ratio 11.15 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 96 Baxter Street (Chung Pak) (City Planning 2021M0131): Completed, filed Jan 11, 2021, decided Aug 13, 2021. Proposed substantial compliance of a previously approved special permit located at 96 Baxter Street, Lower Manhattan, Community District 1.
- 125 WALKER ST (City Planning P1990M0264): Completed, decided Dec 18, 1989. 1ST MODIFICATION TO PERMIT THE ADDITION OF A MEZZANINE ABOVE\*THE 1ST FLOOR RETAIL COMMERCIAL SPACE NOT TO EXCEED 2,390SF

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology