164 Canal Street, Manhattan
Commercial · built c. 1915 · Block 201, Lot 18.
Building permits
- Alteration, filed Oct 9, 2026, estimated cost $200K, described as “General construction modifications as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 21, 2026, estimated cost $584K, described as “Proposed exterior tenant improvement work. No change in use, egress, or occupancy”
- Alteration, filed Apr 14, 2026, estimated cost $10K, described as “Structural modifications as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 18, 2023, estimated cost $1K, described as “Installation of working platform as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Jul 20, 2023, estimated cost $1K, described as “Installation of support scaffolding as indicated on the attached drawings. There are no changes in use, egress or occupancy”
- Alteration, filed Jun 26, 2023, estimated cost $1K, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Jun 21, 2023, estimated cost $1K, described as “Installation of roof protection as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Jan 4, 2023, estimated cost $190K, described as “Mechanical systems modifications taking place on the 6TH floor per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 19, 2022, estimated cost $180K, described as “General construction modifications related to installation of access stair, bulkhead modifications for proposed passive recreation area on roof per plans filed herewith.”
- Alteration, filed Dec 17, 2022, estimated cost $85K, described as “Plumbing modifications taking place on the 6TH floor per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 17, 2022, estimated cost $40K, described as “Modifications to existing sprinkler system on the 6TH floor per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 14, 2022, estimated cost $900K, described as “General construction modifications taking place on the 6TH floor per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 22, 2021, estimated cost $12K, described as “Interior demolition on 6TH floor consisiting of removal of non-load bearing paritions, doors, and cabinetry. No changes to egress, occupancy or use.”
- Alteration, filed Jun 9, 2021, estimated cost $208K, described as “Interior renovation of Suite 300 as shown per plans filed herewith. No change in occupancy, egress, or use.”
- Alteration, filed Aug 11, 2020, estimated cost $54K, described as “Sprinkler and plumbing modifications. No change in use egress or occupancy.”
Property taxes
- Assessment
- $11,630,700
- 2026–27 tax
- $1,261,698
- Market value (city estimate)
- $25,846,000
- Taxable value
- $11,630,700
- Assessed land
- $954,000
- Assessed improvements
- $10,676,700
Zoning
C6-1G: floor area ratio 5.55 built, 6.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Mar 24, 2026: $40,500,000, 39,224 sq ft ($1,033 per sq ft)
Open-market sales since 2016, from the Department of Finance’s sales files.