# 167 Canal Street, Manhattan

Commercial · built c. 1900 · Block 204, Lot 27.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1002040027/167-canal-street

More construction in Chinatown: https://umarelli.org/nyc/manhattan/chinatown.md

Every lot on block 204: https://umarelli.org/nyc/manhattan/204.md

## Building permits

- Alteration, filed Jun 26, 2025, estimated cost $30K, described as “General renovation on exist. Store with, repair/new storefront, partition, floor, ceiling, door, counter and painting, also install new split type a/c as per plan. No change in use, egress or occupancy.”
- Alteration, filed May 29, 2025, estimated cost $2K, described as “Installation of temporary construction fence as per plan. No change in use, egress, or occupancy.”
- Alteration, filed Sep 28, 2023, estimated cost $8K, described as “Install new mechanical equipment for #167 retail space on the 1ST floor, no change of use, egress or occupancy.”
- Alteration, filed Aug 2, 2023, estimated cost $140K, described as “Structural framing and foundation work as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 4, 2022, estimated cost $1K, described as “Legalize (1) existing split system on the roof floor to remove FDNY violation:#11750657Y.no change of use, egress or occupancy.”
- Alteration, filed Nov 9, 2018, estimated cost $21K, described as “Modification of existing an antenna site. Replace (6) antennas on existing mounts. Relocate (2) existing antenna sectors and related cabling. All work is in conformance with tppn #5/98. No change in use, egress, or occupancy. Carrier:…”
- Alteration, filed Oct 24, 2018, estimated cost $5K, described as “Erect an illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. No change in use, egress or occupancy.”
- Alteration, filed Oct 23, 2018, estimated cost $8K, described as “Erect an illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. No change in use, egress or occupancy.”
- Alteration, filed Jun 26, 2018, estimated cost $3K, described as “Proposed installation of temporary plywood fence enclosure to comply with chapter 33 of the 2014 building code. All as per plans filed herewith. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $2,229,300
- 2026–27 Tax: $230,745
- Market value (city estimate): $4,954,000
- Taxable value: $2,127,070
- Assessed land: $435,600
- Assessed improvements: $1,793,700

## Zoning

C6-1G: floor area ratio 4.68 built, 6.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
