# 273 Canal Street, Manhattan

Commercial · built c. 1858 · Block 209, Lot 34.

On Umarelli: https://umarelli.org/nyc/1002090034/273-canal-street

More construction in SoHo: https://umarelli.org/nyc/manhattan/soho.md

Every lot on block 209: https://umarelli.org/nyc/manhattan/209.md

## Building permits

- Alteration, filed Aug 11, 2026, estimated cost $3K, described as “Propose new illuminated signage for existing commercial space. No change to use, egress or occupancy.”
- Alteration, filed Jun 30, 2025, estimated cost $321K, described as “Herewith filing architectural work for 4800 sq ft on 3RD floor of building as per plans. No change in use, egerss or occupancy”
- Alteration, filed Feb 5, 2025, estimated cost $40K, described as “Herewith filing architectural work as per plans. No change in use, egerss or occupancy”
- Alteration, filed Jan 30, 2024, estimated cost $5K, described as “Application filed for structural work. No change to use egress or occupancy.”
- Alteration, filed Nov 9, 2023, estimated cost $900, described as “Non advertizing accesory wall sign. (pollo campero logo) pollo campero, no change to use, occupancy or egress.”
- Alteration, filed Oct 10, 2023, estimated cost $528K, described as “Application is filed for a temporary fence”
- Alteration, filed Apr 10, 2023, estimated cost $528K, described as “Interior renovation of existing cellar and 1st floor in existing 5 story commercial buildings.”
- Alteration, filed Mar 30, 2023, estimated cost $149K, described as “Application is filed for modified sprinkler system and plumbing work associated with installing new fixtures at cellar, first floor & second floor.”
- Alteration, filed Aug 31, 2022, estimated cost $20K, described as “Replacement of Four existing H.V.A.C units with the same size/type, and addition of 1 unit, using the exisitng two dunnage structures at the roof level as per plans. No Change to use, egress or Occupancy.”
- Alteration, filed Jun 1, 2021, estimated cost $20K, described as “Replacement of 4 HVAC units on the roof as per plans. No change to use, egress or occupancy.”
- Alteration, filed Nov 7, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 7, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 26, 2018, estimated cost $2K, described as “Business accessory illuminated wall sign. No change to use, occupancy or egress.”
- Alteration, filed Nov 15, 2017, estimated cost $2K, described as “Installation of 25'-0" long plywood construction fence”

## Building history

- Alteration, filed Nov 5, 2010, signed off Jul 8, 2013
- Alteration, filed Jan 30, 2003, signed off Dec 18, 2006, described as “This application is filed to change occupancy/use only on the 2nd, 3rd, 4th, 5th floor and mezzanine above the 5th floor. No work under this application.”
- Alteration, filed Jul 11, 2000, plan exam - disapproved, described as “Convert 2ND thru 5TH floor into joint living work quaters, 1ST floor to art stud io, cellar as accessory storage to 1ST floor.”
- Alteration, filed Jan 19, 2000, plan exam - disapproved, described as “Convert 3RD thru 5TH floor into joint living work quaters. Obtain new c of o.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $2,880,000
- 2026–27 Tax: $284,548
- Market value (city estimate): $6,400,000
- Taxable value: $2,623,050
- Assessed land: $526,500
- Assessed improvements: $2,353,500

## Zoning

M1-5/R9X: floor area ratio 6.00 built, 9.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

## Landmarks

Part of SoHo-Cast Iron Historic District Extension (Historic District). 43 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- SoHo/NoHo (City Planning 2018M0375): Zoning Map Change, Zoning Text Change, Completed, decided Aug 25, 2022. SoHo/NoHo Neighborhood Plan seeks to strengthen SoHo and NoHo as mixed-use neighborhoods and promote equity. The proposal will expand housing opportunities for New Yorkers, reduce burdens for residents and businesses, and support continued…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology