332 Canal Street, Manhattan
Condominium · 5 units · built c. 1910 · Block 210, Lot 7501.
Building permits
- Alteration, filed Oct 10, 2024, estimated cost $100K, described as “General construction associated with rooftop sun-control structure. No change in occupancy, use or egress.”
- Alteration, filed Aug 2, 2023, estimated cost $45K, described as “Facade Repair on Canal street frontage. Repair mortar, repoint, replace loose brick and repair damaged window lintel at 5th floor.”
- Alteration, filed Dec 5, 2022, estimated cost $9K, described as “Proposed installation of 300 psf sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 30, 2022, estimated cost $6K, described as “Installation of New Boiler on 6th Floor. No change of use, egress or occupancy under this application.”
- Alteration, filed Mar 18, 2022, estimated cost $4K, described as “Gen cons - alt: proposed minor interior renovation. New proposed partitions only as per plans. The proposed work does not involve any change to the bulk, use, egress, or occupancy under this application therefore no zoning required.”
- Alteration, filed Oct 22, 2020, estimated cost $8K, described as “Install one boiler on the 5TH floor as shown on drawings. No change to occupancy use or egress.”
- Alteration, filed Mar 27, 2020, estimated cost $120K, described as “Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 25, 2020, estimated cost $100K, described as “Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Jan 10, 2020, estimated cost $48K, described as “Installation of mechanical system and related ductwork as shown on drawings.”
- Alteration, filed Jan 10, 2020, estimated cost $24K, described as “Modification to existing sprinkler system on the 5TH floor only. All as shown on drawings.”
- Alteration, filed Oct 4, 2019, estimated cost $72K, described as “Modification to existing plumbing system in condo loft dwelling on the 5th floor, as per plans filed herewith. no change in use, egress or occupancy.”
- Alteration, filed Sep 17, 2019, estimated cost $32K, described as “Replacement of cooling tower with 2 unit split system with a capacity of 9 tons on the 1ST floor. No change to egress,use, or occupancy.”
- Alteration, filed Apr 25, 2019, estimated cost $1K, described as “8' high plywood construction fence”
- Alteration, filed Nov 13, 2018, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 6, 2018, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
Property taxes
- Assessment
- $8,069,402
- 2026–27 tax
- $615,872
- Market value (city estimate)
- $17,932,001
- Taxable value
- $4,951,135
- Assessed land
- $354,150
- Assessed improvements
- $7,715,252
- Condo units with their own tax lots
- 6
Zoning
C6-2A: floor area ratio 5.98 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.
Recent sales
- Oct 17, 2024: $11,330,325, Apt 3
- Jul 6, 2022: $5,750,000, Unit LOWER
- Jan 28, 2022: $12,657,300, Apt 6
- Jan 16, 2020: $6,000,000, Apt 2
- Aug 28, 2019: $6,109,500, Apt 5
Open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Tribeca East Historic District (Historic District). 33 Landmarks Preservation Commission permits are on file.