329 Canal Street, Manhattan
Apartment Building · 12 units · built c. 1884 · Block 230, Lot 9.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Oct 5, 2026, estimated cost $200K, described as “New office layout with lighting and dropped ceiling as per plans. No change to egress use or occupancy..”
- Alteration, filed Sep 29, 2026, estimated cost $3.4M, described as “New apartment layouts with lighting and dropped ceiling installations as shown on plans. No change to egress use or occupancy.”
- Alteration, filed Feb 26, 2024, estimated cost $20K, described as “Interior renovation of an existing 001 floor retail space. No change in use, occupancy, or egress.”
- Alteration, filed Jan 26, 2024, estimated cost $75K, described as “Filing herewith for mechanical work as per plans. No change to use egress or occupancy on this application.”
- Alteration, filed Jan 26, 2024, estimated cost $230K, described as “Removal and construction of non load bearing partitions and finishes in existing office space. No change to use egress or occupancy on this application.”
- Alteration, filed Jan 3, 2024, estimated cost $4K, described as “Proposed removal of one sink, one dishwasher, one washer and one stall shower in apt. 2A. No change in use, egress or occupancy.”
- Alteration, filed Jan 3, 2024, estimated cost $57K, described as “Proposed interior non bearing wall removal, repairing and touch-up in apt. 2A. Application being filed in conjunction with alteration 1, job number 104755098. No change in use, egress or occupancy.”
- No Work, filed Oct 19, 2023, described as “Retail activities with beverage.”
- Alteration, filed Sep 26, 2022, estimated cost $1K, described as “Installation of temporary construction fence as per plans. No change in use, occupancy or egress.”
- Alteration, filed Aug 3, 2022, estimated cost $50K, described as “Renovation of existing exterior stair at 1ST floor retail entry. No change in use, occupancy, or egress.”
- Alteration, filed Mar 21, 2022, estimated cost $50K, described as “Structural work for sidewalk vault repair.”
- Alteration, filed Feb 10, 2022, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Feb 10, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 16, 2021, estimated cost $27K, described as “Application for replacement of windows on the 2nd, 3rd, 4th, 5th and 6th floor. No change to use, egress or occupancy.”
- Alteration, filed Mar 8, 2021, estimated cost $70K, described as “Filing for Plumbing and Sprinkler work in conjunction with interior renovation of suites 201,400,500 & 600 on the 2nd, 4th, 5th, & 6th floor. No change to use, egress of occupancy.”
- Alteration, filed Mar 8, 2021, estimated cost $350K, described as “Filing for Mechanical and HVAC work in conjunction with interior renovation of suites 201,400,500 & 600 on the 2nd, 4th, 5th, & 6th floor. No change to use, egress of occupancy.”
- Alteration, filed Mar 3, 2021, estimated cost $600K, described as “Filed for interior renovation of suites 201,400,500 & 600 on the 2ND, 4TH, 5TH, & 6TH floor. Replace non-bearing partitions, fixtures lighting and finishes as per plans; no change to use, egress of occupancy.”
- Alteration, filed Dec 16, 2020, estimated cost $15K, described as “Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 16, 2020, estimated cost $15K, described as “Modification to existing HVAC system (duct work) as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 16, 2020, estimated cost $33K, described as “Plumbing work in conjunction with mechanical work on the 4th, 5th, 6th floors, pantry, and powder room. No change in use, egress, or occupancy.”
- Alteration, filed Mar 14, 2020, estimated cost $7K, described as “Filing for changeable copy hand-painted advertising wall sign on side of existing building”
- Alteration, filed Jan 25, 2019, described as “Installation of fence as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 25, 2019, described as “Installation of heavy-duty sidewalk shed as per plans. No change in use, egress or occupancy.”
Building history
- Alteration, filed May 3, 2007, permit issued - entire job/work, units 12 to 5
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $3,719,250
- 2026–27 Tax
- $429,238
- Market value (city estimate)
- $8,265,000
- Taxable value
- $3,455,190
- Assessed land
- $393,750
- Assessed improvements
- $3,325,500
Zoning
M1-5/R9X: floor area ratio 5.68 built, 9.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.
Recent sales
- Sep 30, 2025: $19,500,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of SoHo-Cast Iron Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- SoHo/NoHo (City Planning 2018M0375): Zoning Map Change, Zoning Text Change, Completed, decided Aug 25, 2022. SoHo/NoHo Neighborhood Plan seeks to strengthen SoHo and NoHo as mixed-use neighborhoods and promote equity. The proposal will expand housing opportunities for New Yorkers, reduce burdens for residents and businesses, and support continued…
- 6 GREENE ST A/K/A 329 CANAL ST (City Planning P1983M1631): Completed, decided Aug 31, 1984. CERT-GRANDFATHERING DETERMINATION (ZR74-782) TO LEGALIZE 1*UNIT IN A 6 STORY BLDG
- 6 GREENE ST, A/K/A 329 CANAL ST (City Planning P1983M1167): Completed, decided Aug 8, 1984. CERT-GRANDFATHERING DETERMINATION (ZR74-782) TO LEGALIZE 1*UNIT IN A 6 STORY BLDG
- 329 CANAL ST, 6 GREENE ST (City Planning P1983M1005): Completed, decided Jun 1, 1984. CERT-GRANDFATHERING DETERMINATION, (ZR42-141), 2 UNITS