# 458 Broadway, Manhattan

Co-op · 8 units · built c. 1896 · Block 232, Lot 12.

On Umarelli: https://umarelli.org/nyc/1002320012/458-broadway

More construction in SoHo: https://umarelli.org/nyc/manhattan/soho.md

Every lot on block 232: https://umarelli.org/nyc/manhattan/232.md

## Building permits

- Alteration, filed Jul 25, 2026, estimated cost $83K, described as “Retail space Interior finishes and millwork only, no new partition work, existing lighting to remain.”
- Alteration, filed Dec 5, 2025, estimated cost $250K, described as “General construction associated with cellar restoration work. No change in occupancy, use or egress.”
- Alteration, filed Oct 1, 2025, estimated cost $3K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 11, 2025, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 10, 2025, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Jul 17, 2025, estimated cost $220K, described as “Facade restoration as per plans filed. No change in occupancy, use or egress.”
- Alteration, filed Feb 3, 2025, estimated cost $100K, described as “Apartment renovation to add one and a half bathrooms to existing apartment”
- Alteration, filed Oct 26, 2024, estimated cost $28K, described as “Replacement of two existing indoor HVAC units, installation of two new outdoor mini-split compressors. Installation of associated service platform, refrigeration piping and electrical connections. No change to use, occupancy or egress.”
- Alteration, filed Sep 24, 2024, estimated cost $132K, described as “This Application is filed for the installation of the sidewalk ADA ramp and replacement of the store entry door. No change in use, egress, or occupancy.”
- Alteration, filed Aug 16, 2024, estimated cost $28K, described as “Replacement of two existing indoor HVAC units, installation of two new outdoor mini-split compressors. Installation of associated service platform, refrigeration piping and electrical connections. No change to use, occupancy or egress.”
- Alteration, filed May 23, 2024, estimated cost $321K, described as “Nineth floor apartment renovation as per plan filed herewith. No change in use, egress, or occupancy is involved under this application.”
- Alteration, filed Apr 9, 2024, estimated cost $5K, described as “Installation of 300PSF sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 24, 2023, estimated cost $35K, described as “Temporary shoring of cellar vault area. No change in occupancy, use or gress.”
- Alteration, filed Jan 11, 2023, estimated cost $106K, described as “Application filed to renovate Apartment 3 with non bearing partition modifications and new finishes. No change to egress, occupancy or use under this filing”
- Alteration, filed Aug 12, 2021, estimated cost $18K, described as “Create window opening and prepare for installlation of new fire rated window on east wall at nineth floor and minor finishes work at interior.”
- Alteration, filed Feb 3, 2021, estimated cost $25K, described as “This application is filed to convert exist. unoccupied rooftop to roof garden / roof terrace. Conversion should comply as per BB 2018-002(E)(i) and BB 2018-002 (E)(ii). no amended certificate of occupancy will be require for this…”
- Alteration, filed Nov 19, 2020, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300 psf”
- Alteration, filed Dec 21, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed Dec 21, 2019, estimated cost $1K, described as “Installation of temporary 108' high pipe scaffold originating (off shed)for facade repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Oct 25, 2019, estimated cost $50K, described as “Structural work at roof level. Replacement and reinforcement of roof spandrel beams along south facade. No change in occupancy, use or egress.”
- Alteration, filed Nov 5, 2018, estimated cost $150, described as “Install non-illuminated sign on wall (naked and famous denim)”

## Property taxes

- Assessment: $8,047,800
- 2026–27 tax: $328,919
- Market value (city estimate): $17,884,000
- Taxable value: $2,644,259
- Assessed land: $2,907,000
- Assessed improvements: $5,140,800

## Zoning

M1-5/R9X: floor area ratio 9.76 built, above the 9.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 10, 2026: $4,495,000
- Dec 16, 2025: $1,832,850
- Dec 7, 2022: $4,722,143
- Apr 18, 2022: $4,500,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of SoHo-Cast Iron Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- SoHo/NoHo (City Planning 2018M0375): Zoning map change, Zoning text change, Completed, decided Aug 25, 2022. SoHo/NoHo Neighborhood Plan seeks to strengthen SoHo and NoHo as mixed-use neighborhoods and promote equity. The proposal will expand housing opportunities for New Yorkers, reduce burdens for residents and businesses, and support continued…