299 South Street, Manhattan
Pier or dock · built 1963 · Block 241, Lot 13.
Building permits
- Alteration, filed Apr 15, 2026, estimated cost $250K, described as “Filing for new hot water heat pump system including 2 new heat pumps, 2 heat exchangers, new storage tank and electric water heater replacing existing hot water heat heater and storage tank. No change in egress, use or occupancy.”
- Alteration, filed May 13, 2025, estimated cost $55K, described as “Proposed comprehensive conduit repair and restoration project. All as per plans filed herewith.”
- Alteration, filed Feb 26, 2025, estimated cost $1K, described as “Replacement of generator's flue flex connector.”
- No Work, filed Jun 18, 2024, described as “Temporary Place of Assembly "It's Her Shot"”
- Alteration, filed May 9, 2024, estimated cost $2K, described as “Mechanical work as per plans. No change to use, egress or occupancy filed under this application.”
- No Work, filed May 8, 2024, described as “2-day Smart City Expo & conference event for 1,000 people per day including staff.”
- Alteration, filed Mar 18, 2024, estimated cost $425K, described as “Herewith filing for structural modifications in conjunction with revel electrical charging station per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 18, 2024, estimated cost $425K, described as “Herewith filing for general construction for installation of electrical vehicle charging station per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 21, 2023, estimated cost $2K, described as “Modification of existing sprinkler system as per plans. No change to use, egress or occupancy.”
- No Work, filed Dec 11, 2023
- Alteration, filed Sep 18, 2023, estimated cost $327K, described as “Herewith filing for manhole installation and trenching per plans. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 11, 2023, estimated cost $2K, described as “Modification of plumbing fixtures as per plans. There is no change to use, egress or occupancy filed under this application.”
- Alteration, filed Jul 5, 2023, estimated cost $800K, described as “Empty, purge & clean (1) 4,000-gallon & (3) 3,000 -gallon biodiesel usts. Close in-place (2) usts & upgraded (2) usts. Investigate fifth ust. Upgrade dispensing, piping, sumps & leak detection system, re-use discharge piping, test fire…”
- Alteration, filed May 5, 2023, estimated cost $10K, described as “Install of temp tents, platforms, and prod. equipment, no alt to exist structures for TelevisaUnivision Upfront. TPA by SBS. Producer is responsible to monitor site safety & implement HWAP.”
- Alteration, filed Apr 7, 2023, estimated cost $2K, described as “Application filed to obtain certificate of occupancy for prior approved plans gym / catering establishment ( non simultaneous use ) by edc (econmic development corporation NYC) with minor interior general construction work.”
- No Work, filed Jul 13, 2022, described as “Boutique Denim Sourcing Trade Show, Denim fabric suppliers presentation to the fashion industry. Multiple grab-n-go/quick-serve food/beverage stations placed throughout the floor, no cooking.”
- No Work, filed May 5, 2022, described as “Disney upfront”
- No Work, filed May 4, 2022, described as “Guests can buy and trade sneakers”
- Alteration, filed May 3, 2022, estimated cost $5K, described as “Installation of temporary structure tents, stages, bleachers and truss structure for disney upfront event on 05/17/2022. All structures will be removed upon completion of the event.”
- Alteration, filed Jun 4, 2020, estimated cost $379K, described as “Filing herewith for structural work as per plans.”
- Alteration, filed Jun 4, 2020, estimated cost $145K, described as “Filing herewith for plumbing work as per plans. No change to use egress or occupancy”
- Alteration, filed Jun 4, 2020, estimated cost $569K, described as “Filing herewith for mechanical work as per plans. No change to use egress or occupancy on this application.”
- Alteration, filed Jun 4, 2020, estimated cost $931K, described as “Filing herewith mechanical work for FDNY ems-4 reprogramming/ new mezzanine construction. No change in use, egress, or occupancy is proposed.”
- Alteration, filed Jun 4, 2020, estimated cost $2.4M, described as “Filing herewith for structural concrete and steel work as per plans.”
- Alteration, filed Jun 4, 2020, estimated cost $72K, described as “Remove existing boiler and install new boiler (4-modular units) above flood level (elev. 12 NAVD88) to serve existing building”
5 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $23,621,400
- Market value (city estimate)
- $52,492,000
- Taxable value
- $0
- Assessed land
- $6,075,000
- Assessed improvements
- $17,546,400
Zoning
M1-4: floor area ratio 0.64 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).
Board and land use applications
- BMCR (Bklyn Bridge-Montgomery Coastal Resiliency) (City Planning 2019M0364): Certification, Completed, filed Sep 23, 2021, decided Oct 28, 2022. The Economic Development Corporation (EDC) proposes the installation of permanent flood resilient structures on the waterfront as well as improvements to the waterfront public walkway from the Brooklyn Bridge to Montgomery Street pursuant…
- Two Bridges (HealthCare Chaplaincy) (City Planning P2012M0479): Completed, decided Aug 23, 2013. Minor modification to an existing large-scale residential development to faciliate the development of a new palliative care building (HealthCare Chaplaincy).
- BASKETBALL CITY EAST, PIER 36 (City Planning P2007M0031): Completed, decided Aug 30, 2007. DISPOSITION OF CITY-OWNED BUILDING TO COURT & SPORTS, LLC TO DEVELOP A NEW APPROX. 64,000 SF FACILITY
- PIER 35 & 36 (City Planning P1992M0017): Completed, decided Oct 13, 1992. 90-153M: ESTABLISH PIER 36 AS A FACILITY FOR VEHICLE-DEPENDENT CITY AGENCIES