59 Henry Street, Manhattan
Apartment building · 80 units · built 2021 · Block 280, Lot 15.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Jan 9, 2025, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 27, 2023, described as “Installation of temporary suspended scaffolds per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 27, 2022, estimated cost $1K, described as “Installation and use of temporary mobile mini crane as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Sep 29, 2022, estimated cost $1K, described as “Installation and use of temporarty supported scaffold as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 16, 2022, estimated cost $10K, described as “Installation of single 6703# capacity personnel/material hoist during NB const, filed sep. Hoist shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator application submitted separately”
- Alteration, filed Jul 12, 2022, estimated cost $25K, described as “Installation of heavy duty sidewalk shed during NB const, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 4, 2020, estimated cost $1K, described as “Propose to install temporary standpipe system filed in conjunction with NB # 121205365”
- Alteration, filed Aug 3, 2020, estimated cost $1K, described as “Propose to install new curb cut (12 lf) as per plan in conjunction with NB # 121205365.”
- Alteration, filed Nov 1, 2019, estimated cost $1K, described as “Propose sprinkler and standpipe work in conjunction with NB # 121205365”
- Alteration, filed Oct 8, 2019, estimated cost $1K, described as “Installation of construction fence per plans filed herewith. No change to use, egress or occupancy.”
Property taxes
- Assessment
- $12,185,100
- 2026–27 tax
- $1,515,705
- Market value (city estimate)
- $27,078,000
- Taxable value
- $12,185,100
- Assessed land
- $1,897,200
- Assessed improvements
- $10,287,900
Zoning
R7-2 (part of the lot is C6-1G): floor area ratio 7.27 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
In the news
59 Henry Street’s Façade Continues Installation in Two Bridges, Manhattan, New York YIMBY, Jun 1, 2025.