# 55 Suffolk Street, Manhattan

New or merged lot · Block 346, Lot 75.

The city hasn’t published tax or zoning records for this lot yet; new and merged lots usually appear within a few months.

On Umarelli: https://umarelli.org/nyc/1003460075/55-suffolk-street

## Building permits

- Alteration, filed May 30, 2024, estimated cost $1K, described as “Erect illuminataed non advertising sign on wall- AKA 203 Broome St. No change of use, egress or occupancy”
- Alteration, filed Apr 4, 2024, estimated cost $20K, described as “Plumbing modifications as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Mar 26, 2024, estimated cost $950, described as “Erect non-illuminated accessory business sign on canopy; copy reading "chinese american planning counsel"”
- Alteration, filed Mar 22, 2024, estimated cost $22K, described as “Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Mar 22, 2024, estimated cost $51K, described as “Installation of new Water Source Heat pump and distribution ductwork to provide HVAC to space as per plans filed herewith. No change in use, occupancy, or egress.”
- Alteration, filed Mar 18, 2024, estimated cost $250K, described as “Removal and installation of interior non-bearing partitions and relatedfinishes as per plans filed herewith. No change in use, egress oroccupancy”
- No Work, filed Oct 31, 2023
- Alteration, filed Oct 25, 2023, estimated cost $15K, described as “Suspended scaffold as shown on plans”
- Alteration, filed Oct 6, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 4, 2022, estimated cost $2.5M, described as “Modifications to HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. Filed in conjunction with NB# 121207292;”
- Alteration, filed May 2, 2022, estimated cost $350K, described as “Modifications to plumbing and sprinkler systems as per plans filed herewith. No change in use, egress or occupancy under this application. Filed in conjunction with NB# 121207292.”
- Alteration, filed Apr 29, 2022, estimated cost $354K, described as “Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application. Filed in conjunction with NB# 121207292;”
- Alteration, filed Apr 5, 2022, estimated cost $7.1M, described as “Interior fitout as per plans filed herewith. No change in use, egress or occupancy under this application. Filed in conjunction with NB# 121207292.”
- Alteration, filed Nov 2, 2021, estimated cost $1K, described as “Install emergency generator as shown on plans. Filed in conjunction with NB# 121207292. No change of use egress or occupancy. Energy analysis also included under NB# 121207292.”
- Alteration, filed Aug 9, 2021, estimated cost $3K, described as “Installation of material hoist as shown on plans”
- Alteration, filed Aug 9, 2021, estimated cost $3K, described as “Suspended scaffold as shown on plans”
- Alteration, filed Jul 21, 2021, estimated cost $109K, described as “Use of temporary climbing formwork construction equipment as per plans filed herewith. This application is filed in conjunction with NB-121207292.”
- Alteration, filed Jul 1, 2021, estimated cost $600K, described as “Installation of alternative netting as per plans filed herewith. This application is filed in conjunction with NB-121207292.”
- Alteration, filed Jun 28, 2021, estimated cost $5K, described as “Erect sidewalk shed as shown on plans”
- Alteration, filed Jun 2, 2021, estimated cost $3K, described as “Supported pipe scaffold as shown on plans”
- Alteration, filed May 27, 2021, estimated cost $1K, described as “Installation of (4) gas-fired boilers as per plans filed herewith. No change in use, egress or occupancy under this application. Filed in conjunction with NB# 121207292.”
- Alteration, filed Dec 17, 2020, estimated cost $1K, described as “Install temporary construction fence as per plans filed. Filed in conjunction with new building #121207292.”
- No Work, filed Nov 24, 2020
- Alteration, filed Jul 28, 2020, estimated cost $2K, described as “Installation of sprinkler and standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application. Filed in conjunction with NB# 121207292.”
- Alteration, filed Jul 28, 2020, estimated cost $1K, described as “Installation of temporary standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application. Filed in conjunction with NB# 121207292.”

3 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1003460075/55-suffolk-street.

## In the news

[CPC One Opens at 45 Suffolk Street on Manhattan’s Lower East Side](https://newyorkyimby.com/2024/04/cpc-one-opens-at-45-suffolk-street-on-manhattans-lower-east-side.html), New York YIMBY, Apr 16, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
