180 Broome Street, Manhattan
Condominium · 263 units · built 2018 · Block 346, Lot 7502.
Building permits
- Alteration, filed Mar 17, 2026, estimated cost $27K, described as “Interior renovation of existing restrooms at cellar to replace plumbing fixtures and finishes. No change of use, egress, or occupancy.”
- Alteration, filed Jul 30, 2025, described as “Outrigger Beams for Material Hoisting”
- No Work, filed Oct 24, 2024, described as “Health and Fitness Establishment at Cellar and Ground Floor, with Eating and Drinking at Second Floor”
- Alteration, filed Sep 17, 2024, estimated cost $5K, described as “Illuminated non-advertising accessory wall sign - treated as C6-1 for signage as per cpc special permit 120228 zsm - gym yoga fitness cycling. No change of use, egress or occupancy.”
- Alteration, filed Sep 17, 2024, estimated cost $4K, described as “Illuminated non-advertising accessory wall sign - treated as C6-1 for signage as per cpc special permit 120228 zsm - vital. No change of use, egress or occupancy.”
- Alteration, filed Sep 17, 2024, estimated cost $500, described as “Illuminated non-advertising accessory sign on existing marquee - treated as C6-1 for signage as per cpc special permit 120228 zsm - gym. No change of use, egress or occupancy.”
- Alteration, filed Sep 17, 2024, estimated cost $8K, described as “Illuminated non-advertising accessory wall sign - treated as C6-1 for signage as per cpc special permit 120228 zsm - climbing. No change of use, egress or occupancy.”
- Alteration, filed Sep 17, 2024, estimated cost $1K, described as “Illuminated non-advertising accessory sign on existing marquee - treated as C6-1 for signage as per cpc special permit 120228 zsm - climbing. No change of use, egress or occupancy.”
- Alteration, filed Sep 17, 2024, estimated cost $500, described as “Illuminated non-advertising accessory sign on existing marquee - treated as C6-1 for signage as per cpc special permit 120228 zsm - vital. No change of use, egress or occupancy.”
- No Work, filed Apr 18, 2024
- No Work, filed Apr 18, 2024
- No Work, filed Apr 18, 2024
- Alteration, filed Dec 4, 2023, described as “Facade Restoration”
- Alteration, filed Sep 29, 2023, estimated cost $8K, described as “Herewith filing mechanical work to add a bypass to the building cooling tower as per plans. This application is filed in conjunction with NB application_121191110. No change in use, egress or occupancy.”
- Alteration, filed Sep 27, 2023, estimated cost $2.0M, described as “Build-out of new Health and Fitness Establishment”
- Alteration, filed Sep 18, 2023, estimated cost $30K, described as “Interior alteration work at vacant commercial spaces to modify existing plumbing work. Tenant build out to be filed under separate application. No change of use, egress or occupancy.”
- Alteration, filed Sep 18, 2023, estimated cost $5K, described as “Modification of existing fire standpipe system at cellar, as shown on plans. Tenant build out to be filed under separate application. No change of use, egress or occupancy.”
- Alteration, filed Sep 18, 2023, estimated cost $10K, described as “Existing fire sprinkler system to be modified throughout the area of work at cellar and ground floor, as shown on plans. Tenant build out to be filed under separate application. No change of use, egress or occupancy.”
- Alteration, filed Sep 18, 2023, estimated cost $45K, described as “Interior mechanical alteration work at vacant commercial spaces to modify existing ductwork, piping and equipment, as shown on plans. Tenant build out to be filed under separate application. No change of use, egress or occupancy.”
- Alteration, filed Sep 14, 2023, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy.”
- Alteration, filed Aug 14, 2023, estimated cost $250K, described as “Additional structural work as per plans, filed in conjunction with NB 121191110 and future tenant build-out at cellar, cellar mezzanine & first floor. No change in use, egress or occupancy. Tenant build-out work will be filed under…”
- Alteration, filed Jun 1, 2023, estimated cost $85K, described as “Int demo work at vacant comm spaces to remove int partitions, decorative arch ceiling/lighting, and misc non-structural steel. 1hr FR sep. for new opening filed under sep. app. Tenant build out approved under Alt-CO M00920047-I1 . No…”
- Alteration, filed Oct 6, 2022, estimated cost $25K, described as “Filing herewith temporary partitions modifications related to the proposed tpa application #M08013212-I1. No change in use, egress or occupancy.”
- No Work, filed Sep 30, 2022, described as “A-3 tpa event space for advertising week”
- No Work, filed Sep 14, 2022, described as “A-3 smartcon 2022 tpa event”
9 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $70,932,538
- 2026–27 Tax
- $829,394
- Market value (city estimate)
- $157,627,861
- Taxable value
- $7,514,960
- Assessed land
- $7,355,251
- Assessed improvements
- $63,577,287
- Condo units with their own tax lots
- 7
Tax breaks
- 421-a exemption, through Jun 30, 2056, about $7,482,479 a year below the full tax.
Zoning
R8: floor area ratio 8.65 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Feb 19, 2026: $21,350,000, Unit MKTLN
- Feb 19, 2026: $12,660,000, Apt RTL1, sold with other lots
- Dec 11, 2024: $113,720,847, Unit OFFC
- Dec 11, 2024: $6,043,395, Apt RTL1, sold with other lots
Open-market sales since 2016, from the Department of Finance’s sales files.