170 Avenue C, Manhattan
Co-op · 439 units · built 1950 · Block 382, Lot 100.
Building permits
- Alteration, filed Dec 2, 2025, estimated cost $1.4M, described as “Replacement of existing sanitary, vent, water piping and valves as shown on plans. No change is use or egress.”
- Alteration, filed Dec 2, 2025, estimated cost $1.4M, described as “Replacement of existing sanitary, vent, water piping and valves as shown on plans. No change is use or egress.”
- Alteration, filed Dec 2, 2025, estimated cost $761K, described as “Replacement of plumbing piping and valves as shown on plans”
- Alteration, filed Aug 27, 2025, estimated cost $821K, described as “Filing for IPNA repairs as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Aug 27, 2025, estimated cost $591K, described as “Filing for IPNA repairs as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Jul 31, 2025, estimated cost $1.2M, described as “Replacement of existing steam control valves, steam radiator shut-off valves, heating and ventilation unit and steam traps”
- Alteration, filed Jul 31, 2025, estimated cost $1.1M, described as “Replacement and installation of new mechaical equipment as shown on plans.”
- Alteration, filed Jul 31, 2025, estimated cost $657K, described as “Replacement and installation of new mechaical equipment as shown on plans.”
- Alteration, filed Jul 18, 2025, estimated cost $1K, described as “Installation of temporary construction fence as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jul 17, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Jun 13, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed May 28, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed May 5, 2025, estimated cost $5.2M, described as “Filing for parking garage and pool room rehabilitation. No change in use, occupancy or egress.”
- Alteration, filed Apr 29, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Apr 23, 2025, estimated cost $1.7M, described as “Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Apr 23, 2025, estimated cost $2.9M, described as “Filing for Plaza repairs as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Apr 23, 2025, estimated cost $814K, described as “Filing for facade repairs as per plans filed herewith. No change in use occupancy or egress.”
- Alteration, filed Apr 22, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Nov 1, 2024, estimated cost $113K, described as “Replace a 15 ton rooftop unit and a 7.5 ton split heat pump unit.”
- Alteration, filed Jun 20, 2024, described as “Facade Restoration Via Suspended Scaffolding”
- Alteration, filed Jun 18, 2024, described as “Facade Restoration Via Suspended Scaffolding”
- Alteration, filed Jan 24, 2024, described as “Outriggers system installation, material hoist for inspection for facade repairs.”
- Alteration, filed Jul 20, 2023, estimated cost $15K, described as “Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2020 building codes, chapter 33. No change in use, egress or occupancy.”
- Alteration, filed Feb 17, 2023, estimated cost $9K, described as “Hereby filing this application to install a new wet sprinkler system off existing standpipe to accommodate existing laundry room located in the first floor as per plans submitted.”
- Alteration, filed Feb 17, 2023, estimated cost $9K, described as “Hereby filing this application to install a new wet sprinkler system off existing standpipe to accommodate existing laundry room located in the first floor as per plans submitted.”
1 more, older permit is in this building’s full list on the map.
Property taxes
- Assessment
- $18,094,500
- 2026–27 tax
- $201,908
- Market value (city estimate)
- $40,210,000
- Taxable value
- $0
- Assessed land
- $4,950,000
- Assessed improvements
- $13,144,500
Tax breaks
- Mitchell-Lama exemption, with no end date.
Zoning
R7-2: floor area ratio 4.14 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Recent sales
- Aug 29, 2019: $30,112
- Jun 10, 2019: $31,241
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Haven Plaza Resiliency Project (City Planning P2016M0467): Completed, decided Dec 12, 2016. Minor Modification to Tomkins Square LSRD to facilitate a 2-story mechinical structure to promote flood resilience on Site A of the LSRD.