73 Avenue C, Manhattan
Co-op · 16 units · built c. 1920 · Block 387, Lot 141.
Building permits
- Alteration, filed May 13, 2026, estimated cost $10K, described as “Installation of pylwood fence as per plans. Plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.”
- Alteration, filed Apr 28, 2026, estimated cost $10K, described as “Installation of pylwood fence as per plans. Plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.”
- Alteration, filed Apr 28, 2026, estimated cost $10K, described as “Installation of engineered enclosure system as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed May 1, 2025, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Apr 29, 2025, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Apr 2, 2025, estimated cost $10K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 1, 2025, estimated cost $10K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Aug 8, 2024, estimated cost $2.3M, described as “HPD affordable housing project: propose renovation of existing 6-story with cellar mixed-use building (residential & commerical) building as per plan. A small area of new enlargement for roof mechanical bulkhead. Obtain new c of o.”
- Alteration, filed Aug 24, 2021, estimated cost $5K, described as “Install new 4x8 feet hood for gas burner and grill. No changes in use, egress or occupancy”
- Alteration, filed Jul 14, 2021, estimated cost $11K, described as “Installation of New Plumbing Fixtures, no changes in use, egress or occupancy”
- Alteration, filed Jun 18, 2021, estimated cost $21K, described as “General construction to renovate 1ST flr. Work will include new handicap toilet.new flr tiles and finishes. New exhaust system plumbing and mechanical will be filed separately. No changes in use, egress or occopancy --”
Property taxes
- Assessment
- $990,900
- 2026–27 tax
- $10,547
- Market value (city estimate)
- $2,202,000
- Taxable value
- $84,793
- Assessed land
- $180,000
- Assessed improvements
- $810,900
Tax breaks
- Article XI exemption, through Jun 30, 2061, about $104,348 a year below the full tax.
Zoning
R7A: floor area ratio 5.11 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Recent sales
- Mar 26, 2025: $3,100,000
Open-market sales since 2016, from the Department of Finance’s sales files.