# 82 Avenue A, Manhattan

Utility · Block 401, Lot 1.

On Umarelli: https://umarelli.org/nyc/1004010001/82-avenue-a

More construction in Alphabet City: https://umarelli.org/nyc/manhattan/alphabet-city.md

Every lot on block 401: https://umarelli.org/nyc/manhattan/401.md

## Building permits

- Alteration, filed Oct 10, 2023, estimated cost $303K, described as “Replace deluge system for transformer #2 at con edisons ave a substation. There is no change of use, occupancy, or egress under this application.”
- Alteration, filed Jul 25, 2023, estimated cost $566K, described as “Install of new concrete pier cap & helical pile foundation system to support new station electrical system equipment. Install of structural steel members to support an electrical bus conductor tube & fuse for transformer 2 at con ed's ave…”
- Alteration, filed Aug 18, 2021, estimated cost $261K, described as “Replace deluge system for transformer #1 at con edison's ave a substation. There is no change of use, occupancy, or egress under this application.”
- Alteration, filed Jun 7, 2021, estimated cost $494K, described as “Extension of concrete foundation and steel supports for Transformer #1 at Con Edison's Avenue A Substation.”

## Zoning

R7A: floor area ratio 0.00 built, 4.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology