242 Broome Street, Manhattan
Condominium · 55 units · built 2016 · Block 409, Lot 7502.
Building permits
- Alteration, filed Jun 30, 2025, estimated cost $10K, described as “Installation of 4 (four) new sinks and 1 (one) new electric hot water heater atground floor”
- Alteration, filed May 12, 2025, estimated cost $56K, described as “Structural work for install new solar energy system, heated spa, wood decking and planters in conjunction with DOB now application #M01213748-I1. No change of use, egress or occupancy under this application.”
- Alteration, filed May 6, 2025, estimated cost $20K, described as “Minor plumbing work as per plans. No change of use, egress or occupancy under this application.”
- Alteration, filed Apr 29, 2025, estimated cost $700K, described as “Exterior roof deck renovation. Installation of solar energy system under application #M01213755-I1. No change of use, egress or occupancy under this application.”
- Alteration, filed Jan 18, 2024, estimated cost $130K, described as “Herewith filing minor alteration to propose new bathroom, interior partition and storefront entrance. No change in use, egress or occupancy.”
- Alteration, filed Jul 7, 2023, estimated cost $3K, described as “Refiling application to reflect correct address. Signs previously applied under applications #M00275964 & M00275975”
- Alteration, filed Jan 11, 2023, estimated cost $2K, described as “Erect accessory illuminated channel letter business wall sign, no change to use, egress or occupation”
- Alteration, filed Jul 7, 2022, estimated cost $2K, described as “Erect accessory illuminated channel letter business wall sign-b with a raceway @ broome street elevation. No change to use, egress or occupation”
- Alteration, filed Jul 7, 2022, estimated cost $2K, described as “Erect accessory illuminated channel letter business wall sign-a with a raceway @ ludlow street elevation. No change to use, egress or occupation”
- Alteration, filed Jul 7, 2022, estimated cost $1K, described as “Erect accessory illuminated cabinet business wall sign-c @ ludlow street elevation. No change to use, egress or occupation”
- Alteration, filed Apr 18, 2022, estimated cost $40K, described as “Removal and installation of interior non-load bearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 14, 2022, estimated cost $40K, described as “Modification to HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 24, 2022, estimated cost $25K, described as “Hereby filing for the removal and installation of ductwork. No change to use occupancy or egress.”
- Alteration, filed Mar 17, 2022, estimated cost $30K, described as “Structural work in conjunction with Alteration M00696632”
- Alteration, filed Mar 17, 2022, estimated cost $30K, described as “Plumbing in conjunction with Alteration M00696632”
- Alteration, filed Mar 17, 2022, estimated cost $413K, described as “Renovation to roof deck for 14th floor unit”
- Alteration, filed Mar 14, 2022, estimated cost $50K, described as “Hereby filing for interior tenant fit out. No change to use occupancy or egress.”
- Alteration, filed Mar 11, 2022, estimated cost $39K, described as “Hereby filing for the installation of plumbing fixtures and the removal and installation of sprinkler heads. No change to use occupancy or egress.”
- Alteration, filed Mar 9, 2022, estimated cost $15K, described as “Hereby filing for the structural work in relation to tenant fit out. No change to use occupancy or egress.”
- Alteration, filed Mar 10, 2021, estimated cost $75K, described as “Temporary public assembly - install new temporary interior partitions, tables & chairs for covid-19 vaccination distribution on first floor at essex crossing.”
- No Work, filed Feb 21, 2020
- No Work, filed Jan 15, 2020, described as “Filing herewith temporary place of assembly for icp museum exhibition.”
- No Work, filed Jan 10, 2020, described as “(ICP) Museum Opening Events on 2nd & 3rd Floor from January 22 thru 25, 2020 from 10am thru 10pm. Ground floor Museum events January 22 - April 22,2020 from 10am thru 10pm. see floor description for details.”
- No Work, filed Jan 10, 2020, described as “School Opening Events (International Center of Photography - ICP) on 3rd Floor - 193 max persons - from 1/22/2020 till 4/22/2020 from 8am till11pm.”
- No Work, filed Jan 10, 2020, described as “School Opening Events on 2nd Floor - 190 max persons - from 1/22/2020 till 4/22/2020 from 8am till 11pm.”
8 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $30,121,197
- 2026–27 Tax
- $807,474
- Market value (city estimate)
- $66,935,998
- Taxable value
- $6,982,830
- Assessed land
- $7,822,797
- Assessed improvements
- $22,298,400
- Condo units with their own tax lots
- 60
Tax breaks
- Nonprofit exemption (charitable), with no end date, about $645,612 a year below the full tax.
- Nonprofit exemption (museum), with no end date, about $442,784 a year below the full tax.
- 421-a exemption, through Jun 30, 2039, about $1,565,892 a year below the full tax.
Zoning
C6-1: floor area ratio 6.23 built, above the 6.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 11, 2026: $1,275,000, Apt 14D
- Aug 5, 2026: $1,545,000, Apt 8A
- Jul 9, 2026: $1,580,000, Apt 7D
- Mar 19, 2026: $2,170,000, Apt 7C
- Aug 1, 2025: $2,535,000, Apt 10D
- Jul 18, 2025: $2,250,000, Apt 6C
- Feb 21, 2025: $1,547,500, Apt 5A
- Jan 8, 2025: $24,410, Apt 7E
- Mar 31, 2023: $9,088,767, Apt RTL1
- Mar 31, 2023: $15,330,273, Apt RTL4
The 10 most recent of 68 open-market sales since 2016, from the Department of Finance’s sales files.