Building permits
- Alteration, filed Nov 13, 2026, estimated cost $264K, described as “Replacement of entrance doors and storefronts.”
- Alteration, filed Nov 13, 2026, estimated cost $264K, described as “Replacement of entrance doors and storefronts.”
- Alteration, filed Apr 22, 2025, described as “Suspended scaffold outrigger system for material hoist for restoration work at 200 eldridge streetnew york, ny 10002.”
- Alteration, filed Apr 22, 2025, described as “Suspended scaffold outrigger system for material hoist for restoration work at 61 stanton street, manhattan”
- Alteration, filed Feb 10, 2025, described as “Suspended scaffold outrigger system for material hoist for restoration work at 61 stanton street, manhattan”
- Alteration, filed Feb 10, 2025, described as “Suspended scaffold outrigger system for material hoist for restoration work at 200 eldridge street, manhattan”
- Alteration, filed Dec 9, 2024, estimated cost $10K, described as “Installation of temporary construction fence at 200 eldridge street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Dec 9, 2024, estimated cost $10K, described as “Installation of temporary construction fence at 61 stanton street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Dec 9, 2024, estimated cost $10K, described as “Installation of new sidewalk shed at 200 eldridge street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Dec 9, 2024, estimated cost $10K, described as “Installation of new sidewalk shed at 61 stanton street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jan 12, 2023, estimated cost $2.1M, described as “Full roof membrane assembly above deck, flashing, gravel stop fascia replacement .New guardrails inset from roof”
- Alteration, filed Jan 12, 2023, estimated cost $2.4M, described as “Full roof membrane assembly above deck, flashing, gravel stop fascia replacement .New guardrails inset from roof”
- Alteration, filed Jul 7, 2022, estimated cost $355K, described as “Rmv extg. strfrnt entry drs, frms, intercoms, extg. rear dr or hdwr retrofit of extg. rear dr, frm, extg. ext. conc. Install new strfrnt entry drs, frms, new intercoms, new rear dr. or new rear dr hdwr, install new ff. No change in use,…”
- Alteration, filed Mar 31, 2021, estimated cost $15K, described as “Installation of heavy duty sidewalk shed as per plans. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2014 NYC building code.”
- Alteration, filed Mar 31, 2021, estimated cost $50K, described as “Install gas boiler.”
- Alteration, filed Feb 10, 2021, estimated cost $40K, described as “Replace gas boilers and install indirect water heater.”
- Alteration, filed Apr 20, 2020, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300 psf”
- Alteration, filed Mar 11, 2020, estimated cost $33K, described as “Install one indirect hot water heater and connect existing gas piping to replacement boilers”
Property taxes
- Assessment
- $6,231,600
- Market value (city estimate)
- $13,848,000
- Taxable value
- $0
- Assessed land
- $1,215,000
- Assessed improvements
- $5,016,600
Zoning
C4-4A: floor area ratio 1.36 built, 4.00 allowed by base zoning.