188 Forsyth Street, Manhattan
Co-op · 84 units · built c. 1910 · Block 421, Lot 52.
Building permits
- Alteration, filed Nov 13, 2026, estimated cost $176K, described as “Replacement of entrance doors and storefronts.”
- Alteration, filed Apr 22, 2025, described as “Suspended scaffold outrigger system for material hoist for restoration work at 201 eldridge streetny 10002”
- Alteration, filed Apr 22, 2025, described as “Suspended scaffold outrigger system for material hoist for restoration work at 43 stanton street, manhattan.”
- Alteration, filed Feb 10, 2025, described as “Suspended scaffold outrigger system for material hoist for restoration work at 201 eldridge street, manhattan”
- Alteration, filed Feb 10, 2025, described as “Suspended scaffold outrigger system for material hoist for restoration work at 43 stanton street, manhattan”
- Alteration, filed Dec 9, 2024, estimated cost $10K, described as “Installation of new sidewalk shed at 201 eldridge street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Dec 9, 2024, estimated cost $10K, described as “Installation of temporary construction fence at 43 stanton street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Dec 9, 2024, estimated cost $10K, described as “Installation of new sidewalk shed at 43 stanton street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Dec 9, 2024, estimated cost $10K, described as “Installation of temporary construction fence at 201 eldridge street, manhattan as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jan 13, 2023, estimated cost $2.4M, described as “Full roof membrane assembly above deck, flashing, gravel stop fascia replacement .New guardrails inset from roof”
- Alteration, filed Jan 13, 2023, estimated cost $2.2M, described as “Full roof membrane assembly above deck, flashing, gravel stop fascia replacement .New guardrails inset from roof”
- Alteration, filed Jul 7, 2022, estimated cost $371K, described as “Rmv extg. strfrnt entry drs, frms, intercoms, extg. rear dr or hdwr retrofit of extg. rear dr, frm, extg. ext. conc. Install new strfrnt entry drs, frms, new intercoms, new rear dr. or new rear dr hdwr, install new ff. No change in use,…”
- Alteration, filed Jul 7, 2022, estimated cost $364K, described as “Rmv extg. strfrnt entry drs, frms, intercoms, extg. rear dr or hdwr retrofit of extg. rear dr, frm, extg. ext. conc. Install new strfrnt entry drs, frms, new intercoms, new rear dr. or new rear dr hdwr, install new ff. No change in use,…”
- Alteration, filed Apr 20, 2020, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Apr 20, 2020, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 17, 2020, estimated cost $40K, described as “Replace gas boilers and install indirect water heater.”
- Alteration, filed Mar 11, 2020, estimated cost $40K, described as “Install one turbomax hot water storage tank. Connect existing gas piping to replacement boilers.”
- Alteration, filed May 12, 2018, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
Property taxes
- Assessment
- $4,924,800
- Market value (city estimate)
- $10,944,000
- Taxable value
- $0
- Assessed land
- $1,125,000
- Assessed improvements
- $3,799,800
Zoning
C4-4A: floor area ratio 1.97 built, 4.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jun 5, 2025: $225,000
- Jun 1, 2023: $180,000
- Jun 1, 2023: $410,000
- Mar 23, 2023: $315,000
- Jan 20, 2023: $450,000
- Apr 28, 2022: $380,000
- May 20, 2021: $365,000
- Sep 9, 2019: $190,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- 53 STANTON ST (City Planning P1990M0083): Completed, decided Jan 11, 1990. LDA 'AS IS' TO ARTICLE XI HDFC'S OF BLDGS IN DAMP FOR A*6-STORY BLDG WITH 27 RESIDENTIAL & 3 COMMERCIAL UNITS
- LOWER EAST SIDE INFILL HO (City Planning P1985M0095): Completed, decided Nov 26, 1984. 1ST MINOR CHANGE TO EAST SIDE I URP TO DELETE THIS BLDG*FOR ACQ & DEMOLITION IN ORDER TO REHAB A POTENTIAL*RELOCATION_RESOURCE FOR TENANTS OF THIS BLOCK
- 188 FORSYTH ST, STANTON ST, ELDRIDGE ST & ALLEN ST (City Planning P1982M0933): Completed, decided Dec 16, 1982. P&P-LOWER EAST SIDE INFILL HOUSING
- LOWER E/S INFILL URP (City Planning P1983M0009): Completed, decided Dec 16, 1982. URP-LOWER E/S INFILL URP, SITE 1,2,3.