# 145-147 Bowery, Manhattan

Hotel · built 2021 · Block 423, Lot 9.

On Umarelli: https://umarelli.org/nyc/1004230009/145-147-bowery

More construction in Lower East Side: https://umarelli.org/nyc/manhattan/lower-east-side.md

## Building permits

- Alteration, filed Nov 11, 2022, described as “Illuminated non-advertising double-sided projecting acc sign - in property lines - (piano logo). No change of use, egress or occupancy.”
- Alteration, filed Nov 11, 2022, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - in property lines - the highlight room. No change of use, egress or occupancy.”
- Alteration, filed Nov 11, 2022, estimated cost $850, described as “Illuminated non-advertising accessory wall sign - in property lines - (piano logo) silver lining lounge. No change of use, egress or occupancy.”
- Alteration, filed Nov 10, 2022, estimated cost $250, described as “Illuminated non-advertising double-sided projecting accessory sign - in property lines - sake no hana. No change of use, egress or occupancy.”
- Alteration, filed Nov 10, 2022, estimated cost $300, described as “Illuminated non-advertising double-sided projecting acc sign - in property lines - loosie's nightclub. No change of use, egress or occupancy.”
- Alteration, filed Nov 10, 2022, estimated cost $250, described as “Illuminated non-advertising double-sided projecting acc sign - in property lines - sake no hana. No change of use, egress or occupancy.”
- Alteration, filed Nov 10, 2022, estimated cost $350, described as “Illuminated non-advertising accessory wall sign - in property lines - sake no hana. No change of use, egress or occupancy.”
- Alteration, filed Nov 10, 2022, estimated cost $350, described as “Illuminated non-advertising accessory wall sign - in property lines - sake no hana. No change of use, egress or occupancy.”
- No Work, filed Oct 12, 2022, described as “Halloween Party for Grand Opening of Moxy Hotel for 600 Persons. Event will be Monday October 31, 2022 from 9PM-4AM”
- Alteration, filed Oct 4, 2022, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - moxy. No change of use, egress or occupancy.”
- Alteration, filed Oct 4, 2022, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - moxy. No change of use, egress or occupancy.”
- Alteration, filed Oct 4, 2022, estimated cost $550, described as “Illuminated non-advertising accessory hanging wall sign - in property lines - moxy. No change of use, egress or occupancy.”
- No Work, filed May 26, 2022
- No Work, filed May 26, 2022
- No Work, filed May 26, 2022
- No Work, filed May 26, 2022
- Alteration, filed Apr 4, 2022, estimated cost $1K, described as “Filing for installation of fueloil piping system with fuel oil tank for emergency generator in conjuction with new building# 121205123”
- Alteration, filed Feb 2, 2022, estimated cost $1K, described as “Filing for minor construction work and finishes for food and beverage spaces as per plans”
- Alteration, filed Jan 25, 2022, estimated cost $1K, described as “Filing for boiler installation in conjuction with new building# 121205123”
- Alteration, filed Dec 7, 2021, estimated cost $1K, described as “Installation of temporary mobile crane as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 19, 2021, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 25, 2021, estimated cost $20K, described as “Cars 1&2: installation of dual 7500# capacity personnel/material hoists during NB const. Filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elev appl sub to elev dept.”
- Alteration, filed May 12, 2021, estimated cost $2K, described as “Installation of temporary trolley beam system as per drawings. Temporary trolley beam shall comply with ch #33 of the NYC bc. No change in use, occupancy oregress under this application.”
- Alteration, filed Mar 17, 2021, estimated cost $3K, described as “Installation of heavy duty sidewalk shed during NB const, filed separately. Sidewalk shed shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.dot permits by others for shed installed on…”
- Alteration, filed Jan 8, 2021, estimated cost $10K, described as “Installation of plywood fence as per drawings. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application. Dot permits by others for fence installed on roadway.”

17 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1004230009/145-147-bowery.

## Property taxes

- Assessment: $26,467,200
- 2026–27 tax: $2,166,044
- Market value (city estimate): $58,816,000
- Taxable value: $19,967,220
- Assessed land: $2,337,750
- Assessed improvements: $24,129,450

## Zoning

C6-1G (part of the lot is C6-3A): floor area ratio 8.76 built, above the 6.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Dec 3, 2018: $27,850,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[Moxy Lower East Side’s Exterior Wraps Up at 145 Bowery on Manhattan’s Lower East Side](https://newyorkyimby.com/2022/09/moxy-lower-east-sides-exterior-wraps-up-at-145-bowery-on-manhattans-lower-east-side.html), New York YIMBY, Sep 4, 2022.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
