# 195 Bowery, Manhattan

Condominium · 16 units · built c. 1900 · Block 425, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1004257501/195-bowery

More construction in Lower East Side: https://umarelli.org/nyc/manhattan/lower-east-side.md

Every lot on block 425: https://umarelli.org/nyc/manhattan/425.md

## Building permits

- Alteration, filed Aug 28, 2026, estimated cost $126K, described as “Repair exterior and interior water damaged walls and ceiling as shown on drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 14, 2026, estimated cost $180K, described as “Interior renovation at 2ND floor including change of use from existing commercial office to residential apartment use”
- Alteration, filed Sep 18, 2025, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 19, 2025, estimated cost $187K, described as “Change of use at the 3RD floor of the existing 16-story mixed use building (195 bowery portion), to convert from existing commercial office use to proposed 1 residential apartment.”
- Alteration, filed Dec 31, 2024, estimated cost $3K, described as “Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 28, 2024, described as “Installation of suspended scaffold for facade inspection/repair.”
- Alteration, filed Sep 12, 2024, estimated cost $1K, described as “Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 1, 2024, estimated cost $15K, described as “Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 6, 2023, described as “Installation of temporary suspended scaffold for facade inspection and repair.”
- Alteration, filed Jul 11, 2023, estimated cost $3K, described as “Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 8, 2021, estimated cost $10K, described as “Supported scaffold for worker access. No change in use, egress, or occupancy.”
- Alteration, filed Nov 10, 2021, estimated cost $10K, described as “Sidewwalk shed for protection of public. No change in use, egress, or occupancy.”
- Alteration, filed Mar 16, 2021, estimated cost $5K, described as “Erect, maintain & dismantle of scaffold for facade repairs as per drawings attached herewith”
- Alteration, filed Jan 28, 2020, estimated cost $95K, described as “Install (2) new gas fired hot water boilers with integral burners. No change in means of egress use group or occupancy.”
- Alteration, filed Jan 24, 2020, estimated cost $10K, described as “Reconnect existing low pressure gas line. No gas test required. Replacement (2) new gas fired hot water boilers with integral burners will be filed under separate application on DOB now. No change in means of egress use group or occupancy.”
- Alteration, filed Dec 3, 2019, estimated cost $8K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code.”

## Property taxes

- Assessment: $6,036,296
- 2026–27 tax: $596,371
- Market value (city estimate): $13,413,999
- Taxable value: $5,520,156
- Assessed land: $674,998
- Assessed improvements: $5,361,298
- Condo units with their own tax lots: 23

## Tax breaks

- Nonprofit exemption (benevolent), with no end date, about $43,005 a year below the full tax.
- Co-op and condo abatement, with no end date, a $58,958 credit this tax year.

## Zoning

C6-1 (part of the lot is C6-3A): floor area ratio 5.24 built, 6.00 allowed by base zoning.

## Recent sales

- Nov 30, 2025: $46,931, Apt 1B
- Dec 8, 2023: $1,750,000, Apt 3B
- Jun 21, 2023: $1,406,500, Apt 4SW
- May 12, 2023: $2,475,000, Apt 11
- Oct 27, 2022: $1,135,000, Apt 5W
- Jul 1, 2022: $2,100,000, Apt 3B
- Aug 31, 2021: $3,000,000, Apt 13
- May 20, 2021: $2,349,000, Apt 10
- Apr 29, 2021: $2,315,000, Apt 14
- Sep 26, 2018: $2,925,000, Apt 11

The 10 most recent of 11 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
