227 Bowery, Manhattan
Religious · built c. 1876 · Block 426, Lot 8.
Building permits
- Alteration, filed Oct 22, 2026, estimated cost $1K, described as “Installation of temporary construction fence as per plans. No change in use, occupancy or egress.”
- Alteration, filed Oct 8, 2026, estimated cost $1K, described as “Installation of temporary shoring as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2022 the ny building code.”
- Alteration, filed Oct 6, 2026, estimated cost $1K, described as “Installation of temporary construction fence as per plans. No change in use, occupancy or egress.”
- Alteration, filed Sep 2, 2025, estimated cost $295K, described as “It is proposed to install rear wall stabilization as shown on plans. No change of use, egress or occupancy. Application filed in conjunction with M00680116-I1 (gc) and M00680170-1 (st).”
- Alteration, filed Aug 25, 2025, estimated cost $237K, described as “Replace existing roof membrane with new roof membrane at rear of 227 bowery as shown on plans. No change of use, egress or occupancy.”
- Alteration, filed Nov 8, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- No Work, filed Dec 15, 2023
- No Work, filed Dec 15, 2023
- Alteration, filed Aug 1, 2023, estimated cost $5K, described as “Installation of 300PSF sidewalk shed as per plans.sidewalk shed shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.”
- Alteration, filed Jul 1, 2022, estimated cost $26K, described as “It is proposed to cap & remove and install new plumbing fixtures as shown on plans. Application filed in conjunction with M00733998 (GC) and M00729288 (MS).”
- Alteration, filed Jul 1, 2022, estimated cost $85K, described as “Remove Exist HW fin tube radiators; furnish & install new cooling & htg system w/new air cooled heat pump & wall mounted ductless air conditioning units w/refrigerant piping & insulation; furnish & install new elec basebd htrs see comments”
- Alteration, filed Jun 30, 2022, estimated cost $106K, described as “Cellar - former abandoned boiler room converted for use as pantry storage. 3fl rear wing - provide new door & wall for 1 new bedroom; 4fl rear wing - provide new staff offices & conference room. Application filed in conj w/M00729288 (MS)…”
- Alteration, filed Apr 21, 2022, estimated cost $100K, described as “It is proposed to repair (1) on-site vault. Repair & stabilize rear brick wall of 227 Bower. Application filed in conjunction with M00680170-I1 (ST). Additional rear wall stabilization filed under M01240275-I1”
- Alteration, filed Apr 21, 2022, estimated cost $112K, described as “It is proposed to repair (1) on-site vault and rear wall stabilization. Application filed in conjunction with M00680116-I1 (gc).”
- No Work, filed Nov 11, 2019, described as “19_752-The Bowery Mission is a Charitable Organization committed to serving Thanksgiving Dinner for needy New Yorkers, food and beverage served. Monitored entry.”
Property taxes
- Assessment
- $1,269,000
- Market value (city estimate)
- $2,820,000
- Taxable value
- $0
- Assessed land
- $422,550
- Assessed improvements
- $846,450
Tax breaks
- Nonprofit exemption (charitable), with no end date, about $137,661 a year below the full tax.
Zoning
C6-1: floor area ratio 3.71 built, 6.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Bowery Mission (Individual Landmark). 11 Landmarks Preservation Commission permits are on file.
Board and land use applications
- Bowery Mission (City Planning P2013M0046): Landmark designation, Completed, decided Sep 29, 2012. The Landmarks Preservation Commission is requesting a report from the City Planning Commission on the Bowery Mission (LP-2494, Designation List 457, June 26, 2012)