43 1st Avenue, Manhattan
Apartment building · 72 units · built c. 1910 · Block 444, Lot 34.
Building permits
- Alteration, filed Oct 7, 2025, estimated cost $68K, described as “Herewith file to renovate exist. Apartment unit #2K. Work includes new non-load bearing wall, new paint, refinish flooring, replace plumbing fixtures, and general construction. No change in use, egress, and occupancy”
- Alteration, filed Sep 1, 2025, estimated cost $54K, described as “Herewith file to renovate exist. Apartment unit #3O. Work includes new non-load bearing wall, new paint, refinish flooring, replace plumbing fixtures, and general construction. No change in use, egress, and occupancy”
- Alteration, filed Jun 6, 2024, estimated cost $120K, described as “Herewith file to rehabilitate existing hallway and stairway (exit access). Work includes replace floor covering with porcelain tile, paint through-out space, and minor repair. No change in use, egress, and occupancy”
- Alteration, filed Apr 5, 2024, estimated cost $79K, described as “Herewith file to renovate exist. Apartment unit #5C. Work includes new non-load bearing wall, new paint, refinish flooring, replace plumbing fixtures, and general construction. No change in use, egress, and occupancy”
- Alteration, filed Mar 9, 2023, estimated cost $8K, described as “Herewith file to install handicapped accessible ramp for 1ST floor commercial store (e. 3rd st. Side) front-entry area. No change in use, egress, and occupancy”
- Alteration, filed May 6, 2022, estimated cost $9K, described as “Application filling to Install new door and window lintels as per drawings”
- Alteration, filed Apr 6, 2022, estimated cost $63K, described as “Herewith file to renovate exist. Apartment unit #5O. Work includes new non-load bearing wall, new paint, refinish flooring, replace/new plumbing fixtures, and general construction. No change in use, egress, and occupancy”
- Alteration, filed Jul 15, 2021, estimated cost $4K, described as “Application filed for install new sink at 1ST floor commericial space as per drawings.”
- Alteration, filed Jul 15, 2021, estimated cost $20K, described as “Application filled for miner interior renovation of existing commercial space as per drawings to add service counter at 1st floor and walk-in clod storage box at caller level”
- Alteration, filed May 14, 2021, estimated cost $43K, described as “Herewith file to renovate exist. Unit #3J. Work includes new non-load bearing wall, new paint, new flooring and general construction. No change in use, egress, and occupancy”
- Alteration, filed May 14, 2021, estimated cost $10K, described as “Herewith file to renovate exist. Unit #3J. Work includes new/replace of plumbing fixtures with fire-stop provided, and minor construction. No change in use, egress, and occupancy”
- Alteration, filed Mar 19, 2021, estimated cost $5K, described as “Herewith file for tenant fit-out space alteration. Work includes new ADA plumbing installation with fire-stopping provided, and minor construction. No change in use, egress, and occupancy”
- Alteration, filed Mar 11, 2021, estimated cost $2K, described as “Non-illuminated non-advertisig accessory storefront awning - tropic berry cafe - no change to use, egress, or occupancy”
- Alteration, filed Feb 7, 2021, estimated cost $6K, described as “Herewith file to renovate exist. Unit #5G. Work includes replace plumbing fixtures, and general construction. No change in use, egress, and occupancy”
- Alteration, filed Feb 7, 2021, estimated cost $35K, described as “Herewith file to renovate exist. Apt unit #5G. Work includes new non-load bearing wall, new paint, new flooring, and general construction. No change in use, egress, and occupancy”
- Alteration, filed Jan 2, 2020, estimated cost $19K, described as “Herewith file to combine two apartments (#4D/#4E) includesnonload bearing partition wall, removal of plumbing fixtures, upgrade kitchen cabinet, and general construction. No change in use, egress, and occupancy”
- Alteration, filed Jan 2, 2020, estimated cost $6K, described as “Herewith file to combine two apartments (#4D/#4E) work includes removal of a bearing wall(3' opening) and to add steel beam across opening to support above floor. No change in use, egress, and occupancy”
- Alteration, filed Mar 14, 2019, estimated cost $50K, described as “Installation of +/-60 feet high x +/- 70 feet wide temporary supported scaffolding as per plans for exterior restoration. All work shall be in accordance with chapter 33 of 2014 NYC building cods. No change in use, egress and occupancy.”
- Alteration, filed Mar 7, 2019, estimated cost $9K, described as “Installation of approximately +/- 90 lf - 10'W x 10'H temporary heavy duty sidewalk shed as per plans for public protection. No change in use, egress or occupancy under this application.”
Property taxes
- Assessment
- $5,943,150
- 2026–27 tax
- $666,814
- Market value (city estimate)
- $13,207,000
- Taxable value
- $5,360,675
- Assessed land
- $724,500
- Assessed improvements
- $5,218,650
Zoning
R7A: floor area ratio 3.26 built, 4.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.