215 1st Avenue, Manhattan
Apartment building · 12 units · built c. 1900 · Block 454, Lot 36.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Feb 14, 2024, estimated cost $22K, described as “Interior renovation and storefront remodeling for an existing store as per the plan filed herewith. No change in use, occupancy, or egress.”
- Alteration, filed Jun 2, 2022, estimated cost $10K, described as “Install new gas meter and gas piping and connect to gas/oil burner filed under M00377280. This job is a re-filing of work performed under M00377488 at the request of con edison. No change in use, egress, or occupancy under this application”
- Alteration, filed Jun 29, 2021, estimated cost $19K, described as “Grinding and pointing, cornice repair and repair stones as per plan . No change in use, egress or occupancy with this application.”
- Alteration, filed Jun 7, 2021, estimated cost $5K, described as “Installation of pipe scaffolding as per plans. Pipe scaffolding shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 19, 2021, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.”
- Alteration, filed Dec 4, 2020, estimated cost $50K, described as “Replace low pressure boiler and burner. No change in use, egress, or occupancy under this application.”
- Alteration, filed Dec 4, 2020, estimated cost $10K, described as “Install new gas meter and gas piping and connect to gas/oil burner filed under M00377280. No change in use, egress, or occupancy under this application.”
- Alteration, filed Oct 1, 2020, estimated cost $3K, described as “Plumbing filing for apartment 1. Plumbing work as per plans. No change in use, occupancy or egress.”
- Alteration, filed Sep 3, 2020, estimated cost $8K, described as “Plumbing filing for apartment 4. Plumbing work as per plans. No change in use, occupancy or egress.”
- Alteration, filed Aug 21, 2020, estimated cost $25K, described as “Install new chimney liner as per plans. No change in use, occupancy, or egress”
- Alteration, filed Aug 13, 2020, estimated cost $21K, described as “Plumbing filing for apartments 6 & 9. Plumbing work as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jul 29, 2020, estimated cost $11K, described as “Plumbing filing for apartment 8. Plumbing work as per plans. No change in use, occupancy or egress.”
- Alteration, filed Jul 7, 2020, estimated cost $21K, described as “Plumbing filing for apartments 2 and 5. Plumbing work as plans. No change, occupancy or egress. General construction construction filed under job# 140888760.”
- Alteration, filed Mar 5, 2020, estimated cost $8K, described as “Enlargement of existing door opening at the exterior facade s per plans, no change in use occupancy or egress”
Property taxes
- Assessment
- $1,959,300
- 2026–27 tax
- $217,789
- Assessed land
- $214,200
- Assessed improvements
- $1,745,100
Zoning
R7A: floor area ratio 4.98 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- May 31, 2019: $19,650,000, sold with other lots
Open-market sales since 2016, from the Department of Finance’s sales files.