# 3 Saint Marks Place, Manhattan

Commercial · built 2023 · Block 464, Lot 59.

On Umarelli: https://umarelli.org/nyc/1004640059/3-saint-marks-place

More construction in East Village: https://umarelli.org/nyc/manhattan/east-village.md

## Building permits

- Alteration, filed Sep 29, 2026, estimated cost $508K, described as “Interior renovation of the 8TH and 9TH floor as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed Sep 18, 2026, estimated cost $608K, described as “Interior renovaition of the 6TH & 7TH floor partitions, ceilings, doors and finishes as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed Jul 31, 2026, estimated cost $15K, described as “Filing herewith alterations to the existing new steel framed structure. New stair opening in the 7TH floor as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed Apr 22, 2026, estimated cost $20K, described as “Installation of new backflow preventer”
- Alteration, filed Apr 8, 2026, estimated cost $20K, described as “Installation of new 6" fire service”
- Alteration, filed Apr 6, 2026, estimated cost $40K, described as “Modification of existing sprinklers and addition of a second sprinkler control valve.”
- Alteration, filed Mar 26, 2026, estimated cost $519K, described as “Interior renovation of lobby as per plans filed herewith, no change in use, egress or occupancy.”
- Alteration, filed Mar 23, 2026, estimated cost $3K, described as “Illuminated non-advertising accessory wall sign - sephora. No change of use, egress or occupancy.”
- Alteration, filed Mar 23, 2026, estimated cost $2K, described as “Illuminated non-advertising accessory wall sign - sephora. No change of use, egress or occupancy.”
- Alteration, filed Dec 18, 2025, estimated cost $900K, described as “Storefront door repositioning, addition of retail staircase and freight elevator going from cellar to 1st floor, raising height of retail floor approx 3 inches”
- Alteration, filed Oct 30, 2025, estimated cost $10K, described as “Demolition work filed for retail space on first floor.”
- Alteration, filed Aug 13, 2025, estimated cost $18K, described as “HVAC Support (Water Source Heat Pumps). No change in use occupancy egress.”
- Alteration, filed Jul 30, 2025, estimated cost $75K, described as “Modifications to existing plumbing system. no change in use occupancy or egress”
- Alteration, filed Jul 30, 2025, estimated cost $297K, described as “Retail tenant alteration. no change in use egress of occupancy”
- Alteration, filed Jul 22, 2025, estimated cost $1.2M, described as “Retail roll-out renovation. no change in use egress or occupancy”
- Alteration, filed Sep 12, 2023, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 9, 2023, estimated cost $6K, described as “Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application”
- Alteration, filed Jul 14, 2023, estimated cost $10K, described as “Installation of single personnel/material hoist during NB filed sep. Hoists shall comply with the 2022 bldg codes, ch #33. No change in use, occupancy or egress under this application. Elev appl submitted to elev dept under separate…”
- Alteration, filed Jun 5, 2023, estimated cost $3K, described as “Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 13, 2022, estimated cost $10K, described as “Fuel oil system filed in conjunction with NB filing #121189034”
- Alteration, filed Mar 11, 2020, estimated cost $20K, described as “Installation of plywood fence during new building construction, filed separately. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed May 20, 2019, estimated cost $2K, described as “Install plywood construction fence”
- Alteration, filed May 20, 2019, estimated cost $2K, described as “Install plywood Construction fence”
- Alteration, filed May 20, 2019, estimated cost $2K, described as “Install plywood construction fence”
- Alteration, filed May 16, 2019, estimated cost $15K, described as “Work includes installation of scaffolding in association with building demolition.”

3 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1004640059/3-saint-marks-place.

## Property taxes

- Assessment: $9,348,750
- 2026–27 tax: $1,014,152
- Market value (city estimate): $20,775,000
- Taxable value: $9,348,750
- Assessed land: $3,492,900
- Assessed improvements: $5,855,850

## Zoning

C6-1: floor area ratio 8.75 built, above the 6.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 3 St Marks Place (City Planning P2018M0268): Completed, decided Oct 20, 2020. This is a private application by Real Estate Equities Corporation seeking a special permit to transfer approximately 8,300 sf from a Landmark Site (4 St. Marks Pl) pursuant to ZR 74-79 and to modify the height and setback requirements of…

## In the news

[3 St. Mark’s Place Nears Completion in East Village, Manhattan](https://newyorkyimby.com/2024/09/3-st-marks-place-nears-completion-in-east-village-manhattan.html), New York YIMBY, Sep 12, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology