64 Grand Street, Manhattan
Co-op · 22 units · built c. 1880 · Block 475, Lot 28.
Building permits
- Alteration, filed Sep 6, 2026, estimated cost $50K, described as “Proposed interior renovation of a joint living and work unit on the sixth floor of the building”
- Alteration, filed May 30, 2025, estimated cost $18K, described as “Addition of office in joint unit and work quarters for artist as shown on submitted plans. No change in occupancy, use or egress.”
- Alteration, filed Nov 2, 2023, estimated cost $1K, described as “Installation and use of temporary material hoisting equipment as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Oct 10, 2023, estimated cost $1K, described as “Installation and use of temporary sidewalk shed as per plans filed herewith. No change to use, egress or occupancy under this application.”
- Alteration, filed Sep 22, 2023, estimated cost $101K, described as “The scope of work entails the replacement of the existing roof with a new multi-ply modified bitumen roofing membrane system, brickwork, replacement of flashing, and new railings. No change in use, occupancy, or egress.”
- Alteration, filed Aug 1, 2023, estimated cost $56K, described as “Interior renovation of existingone-dwelling unit at 4TH floor. No change in use, egress, or occupancy”
- Alteration, filed Apr 21, 2022, estimated cost $15K, described as “St work for increasing load capacity on roof. No change to use, occupancy or egress.”
- Alteration, filed Jan 25, 2022, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Jan 25, 2022, estimated cost $9K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Dec 17, 2021, described as “Installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.”
- Alteration, filed Nov 3, 2021, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Nov 3, 2021, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300 psf”
- Alteration, filed Oct 4, 2021, estimated cost $25K, described as “Local Law 11/98 facade repair for brick repointing at front (primary) elevation with recladding of roof top-bulk head and replacement EMR ship ladder access with new, as per plans filed herewith. No change to use egress or occupancy on…”
- Alteration, filed Apr 19, 2021, estimated cost $247K, described as “Interior renovation in apt 5. No change to use, occupancy or egress.”
- Alteration, filed May 23, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $6,013,800
- 2026–27 Tax
- $607,938
- Market value (city estimate)
- $13,364,000
- Taxable value
- $5,463,520
- Assessed land
- $585,000
- Assessed improvements
- $5,428,800
Tax breaks
- Co-op and condo abatement, with no end date, a $72,292 credit this tax year.
Zoning
M1-5/R7X: floor area ratio 4.90 built, 5.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29).
Recent sales
- Mar 20, 2023: $2,200,000
- Jul 17, 2020: $3,300,000, Apt 5
- Jun 26, 2018: $2,675,000
- May 17, 2018: $4,175,000
- Jan 9, 2018: $2,300,000
- May 30, 2017: $4,250,000
- Mar 16, 2017: $2,900,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of SoHo-Cast Iron Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- SoHo/NoHo (City Planning 2018M0375): Zoning map change, Zoning text change, Completed, decided Aug 25, 2022. SoHo/NoHo Neighborhood Plan seeks to strengthen SoHo and NoHo as mixed-use neighborhoods and promote equity. The proposal will expand housing opportunities for New Yorkers, reduce burdens for residents and businesses, and support continued…