## Building permits

- Alteration, filed Dec 12, 2025, estimated cost $82K, described as “Interior renovation existing commercial space with partition work on 1ST floor. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 16, 2025, estimated cost $98K, described as “Interior alteration to existing retail space including removal of interior partitions, floor finishes, and doors. No change in bulk, floor area, or occupancy under this application.”
- Alteration, filed Sep 10, 2024, estimated cost $5K, described as “Interior demo filing for walls partitions and doors, no change to use, egress or occupancy.”
- No Work, filed Jul 8, 2021
- Alteration, filed May 7, 2021, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed Nov 23, 2020, estimated cost $30K, described as “New sliding partition support”
- No Work, filed Oct 30, 2020
- Alteration, filed Sep 11, 2020, estimated cost $55K, described as “Installation of plumbing fixtures along with related piping.”
- Alteration, filed Sep 11, 2020, estimated cost $210K, described as “Installation of mechanical units and duct work along with associated piping.”
- Alteration, filed Sep 10, 2020, estimated cost $45K, described as “Installation of Sprinkler fixtures along with related piping.”
- Alteration, filed Mar 10, 2020, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- No Work, filed Feb 27, 2020, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from march 3, 2020 thru march 31, 2020. This monthly event was recently approved under the following applications: M00198003, M00198042, M00217727, M00217716, M00235215,…”
- No Work, filed Feb 26, 2020, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from march 2, 2020 thru march 27, 2020. This monthly event was recently approved under the following applications: M00198003, M00198042, M00217727, M00217716, M00235215,…”
- No Work, filed Jan 27, 2020, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from february 4, 2019 thru february 27, 2019. This monthly event was recently approved under the following applications: M00186315, M00186299, M00198003, M00198042,…”
- No Work, filed Jan 27, 2020, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from february 3, 2019 thru february 27, 2019. This monthly event was recently approved under the following applications: M00186315, M00186299, M00198003, M00198042,…”
- No Work, filed Dec 23, 2019, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from january 14, 2019 thru january 23, 2019. This monthly event was recently approved under the following applications: M00171286, M00171489, M00186315, M00186299,…”
- No Work, filed Dec 23, 2019, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from january 7, 2019 thru january 31, 2019. This monthly event was recently approved under the following applications: M00171286, M00171489, M00186315, M00186299,…”
- No Work, filed Nov 20, 2019, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from december 3, 2019 thru december 20, 2019. This monthly event was recently approved under the following applications: M00156691, M00156703, M00171286, M00171489,…”
- No Work, filed Nov 20, 2019, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from december 5, 2019 thru december 12, 2019. This monthly event was recently approved under the following applications: M00156691, M00156703, M00171286, M00171489,…”
- No Work, filed Oct 23, 2019, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from november 1, 2019 thru november 22, 2019. This monthly event was recently approved under the following applications: M00144040, M00144051, M00156691, M00156703,…”
- No Work, filed Oct 23, 2019, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from november 5, 2019 thru november 21, 2019. This monthly event was recently approved under the following applications: M00144040, M00144051, M00156691, M00156703,…”
- No Work, filed Sep 25, 2019, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from september 30, 2019 thru november 1, 2019. This monthly event was recently approved under the following applications: M00132477, M00132509, M00144040, M00144051,…”
- No Work, filed Sep 25, 2019, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from october 1, 2019 thru october 30, 2019. This monthly event was recently approved under the following applications: M00132477, M00132509, M00144040, M00144051,…”
- No Work, filed Aug 27, 2019, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from september 3, 2019 thru september 25, 2019. This monthly event was recently approved under the following applications: M00122762,M00122777, M00132477, M00132509,…”
- No Work, filed Aug 27, 2019, described as “Amazon pop up, the 1ST floor tenant is planning a series of events from september 3, 2019 thru september 25, 2019. This monthly event was recently approved under the following applications: M00122762,M00122777, M00132477, M00132509,…”

16 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1004767502/350-west-broadway.

## Property taxes

- Assessment: $14,008,499
- 2026–27 tax: $1,427,100
- Market value (city estimate): $31,130,000
- Taxable value: $11,472,787
- Assessed land: $1,039,499
- Assessed improvements: $12,969,000
- Condo units with their own tax lots: 8

## Zoning

M1-5/R10: floor area ratio 4.41 built, 10.00 allowed by base zoning.

## Recent sales

- Dec 22, 2022: $6,200,000, Apt 6
- Aug 9, 2022: $7,850,000, Apt 5

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29).

## Board and land use applications

- Change to an earlier grant (Board of Standards and Appeals 29-05-BZII): Change to an earlier grant, Withdrawn, filed May 29, 2009, decided Jun 23, 2009. Extension of Time to Complete Construction of a previously granted Variance (§72-21) for the development of an 10 story mixed-use building to be occupied by retail use on the first and second floors and residential use on floors three…
- Variance or special permit (Board of Standards and Appeals 29-05-BZ): Variance or special permit, Granted, filed Feb 17, 2005, decided Oct 18, 2005. Variance (§72-21) to permit the construction of a thirteen story residential building with retail uses located on the cellar and ground floor levels, located in an M1-5A zoning district, is contrary to Z.R. §42-14, §42-00 and §42-10.
- SoHo/NoHo (City Planning 2018M0375): Zoning map change, Zoning text change, Completed, decided Aug 25, 2022. SoHo/NoHo Neighborhood Plan seeks to strengthen SoHo and NoHo as mixed-use neighborhoods and promote equity. The proposal will expand housing opportunities for New Yorkers, reduce burdens for residents and businesses, and support continued…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology