368 Broome Street, Manhattan
Commercial · built c. 1920 · Block 479, Lot 40.
Building permits
- Alteration, filed Sep 29, 2026, estimated cost $800, described as “Illuminated non-advertising accessory sign on existing marquee - 368 alleycorp 368. No change of use, egress or occupancy.”
- No Work, filed Aug 10, 2026
- Alteration, filed Dec 30, 2025, estimated cost $8K, described as “Non-illuminated non-advertising accessory awnings - oriana. No change of use, egress or occupancy.”
- Alteration, filed Jun 17, 2025, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy. The sidewalk shed is at mott street and brommer street elevations.”
- Alteration, filed Mar 12, 2025, described as “8' high chain-link fence installed at street side of Mott and Broome Street . no change in use, occupancy or egress”
- No Work, filed Nov 13, 2024
- Alteration, filed Oct 17, 2024, estimated cost $125K, described as “General construction application filed for restaurant and bakery tenant fit out. No change in use, egress or occupancy.”
- Alteration, filed Apr 24, 2024, estimated cost $175K, described as “Masonry restoration, replacement, mortar joint work, and infill beam pockets. Arch and lintel repairs, anchor removals, brick replacement and backer rod & joint installation.”
- Alteration, filed Apr 22, 2024, estimated cost $5K, described as “Installation of pipe scaffolding, overhead protection, and roof protection as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Jan 18, 2024, estimated cost $1K, described as “Proposed installation of temporary light duty pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Sep 8, 2023, estimated cost $225K, described as “Structural partial demolition means and methods application filed in conjunction with approved ALT-1 application 123819305.”
- Alteration, filed Sep 10, 2021, described as “Pipe scaffolding installed per plans,no change in use, egress or occupancy”
- Alteration, filed Sep 7, 2021, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 11, 2021, estimated cost $20K, described as “Installation of pipe scaffolding”
Property taxes
- Assessment
- $1,199,700
- 2026–27 tax
- $128,542
- Market value (city estimate)
- $2,666,000
- Taxable value
- $1,184,940
- Assessed land
- $765,000
- Assessed improvements
- $434,700
Zoning
C6-2G (part of the lot is C6-1): floor area ratio 5.67 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 8, 2022: $41,000,000
- Dec 15, 2016: $11,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.