213 Mulberry Street, Manhattan
Apartment Building · 15 units · built c. 1910 · Block 495, Lot 42.
Building permits
- Alteration, filed Nov 13, 2026, estimated cost $40K, described as “Parapet wall replacement.”
- Alteration, filed Oct 9, 2026, estimated cost $3K, described as “Heavy duty sidewalk shed as per emergency declaration. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 13, 2026, estimated cost $121K, described as “Minor partition work with general carpentry in apts 10 & 12. No change to use bulk or egress.”
- Alteration, filed Jul 14, 2023, estimated cost $9K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 22, 2023, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code. No change in use occupancy or egress under this application.”
- Alteration, filed Jan 5, 2023, estimated cost $14K, described as “Minor renovation of existing commercial space. No change in layout. No change in use, egress or occupancy”
- Alteration, filed May 12, 2022, estimated cost $12K, described as “4th flr rel 1 wc, 1 lav, 1 shower, repl 1 sink, 1 new washer, 1 new dw, 6th flr rel 1 wc, 1 lav, repl 1 sink, 1 new washer, 1 new dw, 1 new shower”
- Alteration, filed May 4, 2022, estimated cost $78K, described as “Minor partition work with general carpentry in apt 9 & 15. No change to use , bulk or egress”
- Alteration, filed Oct 20, 2020, estimated cost $16K, described as “Furnish and install 12 gauge black iron duct riser from first floor up to roof, capped both sides for future use. No change in use, egress or occupancy.”
- Alteration, filed Oct 13, 2020, estimated cost $9K, described as “File mh work type in conjunction with alt-2 job #140949151”
- Alteration, filed Oct 3, 2020, estimated cost $9K, described as “File pl worktype in conjunction with alt-2 JOB#140949151”
- Alteration, filed Sep 1, 2020, estimated cost $1K, described as “File construction fence at above address. No change in use, occupancy or egress.”
- Alteration, filed Jun 1, 2020, estimated cost $18K, described as “2nd flr -replace 1 wc, 1 lav, relocate 1 sk, 1 new shower, 1 new washer, 1 new dw, cap & remove 1 tub, 3rd flr relocate 1 wc, 1 lav 1 sink, 1 shower replace 1 sink, 1 lav, 1 wc, 1 new showers, 2 new dw, 2 new washers, cap and remove 1 tub”
- Alteration, filed Nov 6, 2019, estimated cost $7K, described as “Under this PAA revised scope location of gas meter under scope of work , no change to plans- Note plans approved under first PAA”
Property taxes
- Assessment
- $2,774,250
- 2026–27 Tax
- $301,303
- Market value (city estimate)
- $6,165,000
- Taxable value
- $2,422,245
- Assessed land
- $99,450
- Assessed improvements
- $2,674,800
Zoning
C6-2: floor area ratio 5.81 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 3, 2019: $10,825,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- POMODORO PIZZERIA (City Planning P2000M0497): Completed, decided Mar 15, 2000. RENEWAL-UNENCLOSED SIDEWALK CAFE FOR 5-YEARS, WITH 16 SEATS
- POMODOR0 RISTORANTE & PIZZERIA (City Planning P1995M0558): Completed, decided Jul 10, 1995. RENEWAL-UNENCLOSED SIDEWALK CAFE WITH 16 SEATS FOR 5-YEARS
- POMODORO RISTORANTE & PIZZERIA (City Planning P1993M0487): Completed, decided Jun 1, 1993. RENEWAL-UNENCLOSED SIDEWALK CAFE WITH 16 SEATS FOR 5-YEARS
- POMODORO RISTORANTE & PIZZERIA, INC (City Planning P1991M0718): Completed, decided Jul 10, 1991. NEW-UNENCLOSED SIDEWALK CAFE WITH 16 SEATS
- 51 SPRING ST (City Planning P1983M1988): Completed, decided Jun 17, 1983. RENEWAL-UNENCLOSED SIDEWALK CAFE