92 Greene Street, Manhattan
Condominium · 14 units · built 2005 · Block 499, Lot 7505.
Building permits
- Alteration, filed Oct 9, 2026, estimated cost $85K, described as “Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy”
- Alteration, filed Oct 2, 2026, estimated cost $75K, described as “Interior renovation fitout of existing first floor and cellar retail within an existing 7-story mixed-use building.”
- Alteration, filed Jun 1, 2026, estimated cost $75K, described as “Mechanical work related to the renovation of an existing space. There is no change in the use, egress or occupancy under this application.”
- Alteration, filed Jun 1, 2026, estimated cost $20K, described as “Architectural work related to the renovation of an existing space. There is no change in the use, egress or occupancy under this application.”
- Alteration, filed Jul 10, 2025, estimated cost $180K, described as “Mechanical scope of work for replacement of existing cooling tower with new in-kind at existing location. No change to use, egress or occupancy.”
- Alteration, filed May 21, 2025, estimated cost $10K, described as “Filing herewith for the interior removal of the existing space. There will be no change in egress, occupancy or use.”
- Alteration, filed Apr 30, 2024, estimated cost $50K, described as “Renovation to existing rooftop and 6TH floor terrace as per plans. Includes new wood deck, landscaping and pergola as passive recreational area. Pl work under subsequent filing. No change in use, egress or occupancy.”
- Alteration, filed Mar 7, 2024, estimated cost $280K, described as “Replacement (1) new cooling tower in same location as previously existing.reuse existing steel supports in same location. Replacement cooling tower identical to existing. No change in means of egress use group or occupancy.”
- Alteration, filed Jun 27, 2023, estimated cost $30K, described as “Filing for the installation of 3 air hanlders and related ductwork. No change to use, egress, or occupancy”
- Alteration, filed Dec 13, 2022, estimated cost $28K, described as “Plumbing modifications to unit 3A as per plans. No change in use, egress or occupancy.”
- Alteration, filed Dec 13, 2022, estimated cost $182K, described as “Architectural modifications to existing dwelling unit 3A as per plans. No change to use, egress or occupancy.”
- Alteration, filed Nov 2, 2022, estimated cost $960, described as “Erect accessory business blade sign on the wall for givenchi, no change in use, egress or occupancy.”
- Alteration, filed Nov 2, 2022, estimated cost $400, described as “Erect accessory business wall sign for givenchy, no change in use, egress or occupancy.”
- Alteration, filed Jul 6, 2022, estimated cost $40K, described as “Exterior store front work as shown herewith, no changes to egress, occupancy or use.”
- Alteration, filed Apr 4, 2022, estimated cost $150, described as “Non illuminated non advertising double face projecting accessory sign - hive&colony. No change of use, egress or occupancy.”
- Alteration, filed Mar 24, 2022, estimated cost $300K, described as “Interior general construction as shown herewith. No changes to egress, occupancy or use.”
- Alteration, filed Mar 22, 2022, estimated cost $100K, described as “Interior mechanical work as shown herewith. No changes to egress, occupancy or use.”
- Alteration, filed Mar 22, 2022, estimated cost $15K, described as “Interior plumbing work as shown herewith. No changes to egress, occupancy or use.”
- Alteration, filed Mar 3, 2022, estimated cost $40K, described as “Addition and modifcation to existing sprinkler system as shown herewith. No changes to egress, occupancy or use.”
- Alteration, filed Mar 3, 2022, estimated cost $10K, described as “Sprinler temporary loop for cellar and first floor as shown herewith. No changes to egress, occupancy or use.”
- Alteration, filed Nov 1, 2021, estimated cost $25K, described as “Interior demolition to commerical space as shown herewith. No changes to egress,occupancy or use.”
- Alteration, filed Oct 27, 2021, estimated cost $267K, described as “Roof Replacement Project. No change in use, egress or occupancy.”
- Alteration, filed Jul 16, 2019, estimated cost $1K, described as “Installation of sidewalk shed and support scaffold in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
- Alteration, filed Jul 8, 2019, estimated cost $1K, described as “Installation of sidewalk shed and support scaffold in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
Property taxes
- Assessment
- $10,627,200
- 2026–27 tax
- $1,155,451
- Market value (city estimate)
- $23,616,001
- Taxable value
- $9,927,712
- Assessed land
- $1,529,999
- Assessed improvements
- $9,097,201
- Condo units with their own tax lots
- 17
Zoning
M1-5/R7X: floor area ratio 5.11 built, above the 5.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- May 6, 2026: $4,700,000, Apt 5B
- Dec 5, 2025: $5,575,000, Apt PH-6A
- Oct 17, 2024: $43,375,000, Unit CU-A, sold with other lots
- May 19, 2022: $3,450,000, Apt 3A
- May 6, 2022: $5,400,000, Apt 2A
- Feb 10, 2021: $4,491,300, Apt 5A
- Jun 8, 2020: $3,900,000, Apt 5
- Aug 14, 2017: $5,000,000, Apt 2B
Open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of SoHo-Cast Iron Historic District (Historic District). 29 Landmarks Preservation Commission permits are on file.
Board and land use applications
- Variance or special permit (Board of Standards and Appeals 342-03-BZ): Variance or special permit, Granted, filed Nov 10, 2003, decided Jul 20, 2004. Variance (§72-21) to permit the proposed seven story building, that will have retail use in its cellar and first floor, and residential use on its upper six floors, Use Groups 2 and 6, located in an M1 5A zoning district, which is contrary…
- SoHo/NoHo (City Planning 2018M0375): Zoning map change, Zoning text change, Completed, decided Aug 25, 2022. SoHo/NoHo Neighborhood Plan seeks to strengthen SoHo and NoHo as mixed-use neighborhoods and promote equity. The proposal will expand housing opportunities for New Yorkers, reduce burdens for residents and businesses, and support continued…
- 109 MERCER ST, A/K/A 109-111 SPRING ST (City Planning P1983M1228): Completed, decided Oct 20, 1989. SPEC PERMIT (ZR42-144, 74-782) TO ALLOW CONVERSION TO JOINT*LIVING/WORK QUARTERS FOR ARTISTS