93 Greene Street, Manhattan
Condominium · 29 units · built c. 1881 · Block 500, Lot 7502.
Building permits
- Alteration, filed Apr 6, 2026, estimated cost $193K, described as “Interior renovation of existing 3RD fl apartment (unit 3D). Non-structural partition work, kitchen & bath renovations, new lighting, misc. Millwork. No change to use, egress, or occupancy.”
- Alteration, filed Mar 30, 2026, described as “Suspended Scaffold for Exterior Work”
- Alteration, filed Feb 21, 2025, described as “Suspended Scaffold for Exterior Work”
- Alteration, filed Nov 1, 2024, estimated cost $1K, described as “Installation of temporary plywood fence as per plan. No change in use, egress or occupancy.the plywood fence at the east front bulkhead and the west (rear) bulkhead at the roof.”
- Alteration, filed Apr 15, 2024, estimated cost $56K, described as “Interior renovation of existing 4TH fl apartment (#4A).partition work, kitchen & bath renovations, new lighting, misc. Cabinetry. No change to use, egress, or occupancy.”
- Alteration, filed Dec 8, 2023, described as “Renewal of Existing CD5 SR23-1254”
- Alteration, filed Nov 10, 2023, estimated cost $200K, described as “Removal and installation of HVAC system in cellar and 1st floor retail spaces. New piping on rear facade to roof. Installation of new HVAC units on existing dunnage of roof. No change to use, egress or occupancy is involved.”
- Alteration, filed Nov 9, 2023, estimated cost $5K, described as “Installation of pipe scaffolding, overhead protection and roof protection as per plans. All equipment shall comply with chapter # 33 of the NYC code 2022. No use in egress or occupancy under this application.”
- Alteration, filed Oct 17, 2023, estimated cost $25K, described as “Installation of RPZ Backflow Preventer, DCDA Double Check Detector Assembly, Sump Pump, Floor Drains and associated piping in the cellar as per plans filed. No change to use, egress or occupancy is involved.”
- Alteration, filed Jul 9, 2023, estimated cost $5K, described as “Install access ladder at Rear (West) Facade to provide access to 1st Floor Roof for maintenance.”
- Alteration, filed Jan 3, 2023, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Dec 12, 2022, estimated cost $153K, described as “Mechanical work on 6th floor, mezzanine, penthouse and roof as per plans submitted herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 12, 2022, estimated cost $66K, described as “Sprinkler work on 6th floor, mezzanine, penthouse and roof as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 12, 2022, estimated cost $195K, described as “Plumbing work on the 6th floor, mezzanine, penthouse and roof as per plans submitted herewith. No change in use, egress or occupancy”
- Alteration, filed Oct 19, 2022, estimated cost $9K, described as “Creation of new opening through interior non-load bearing masonry wall, closing off an existing non-load bearing masonry wall opening, and adding in a landing on either side of a doorway to accommodate the change in floor elevation.”
- Alteration, filed Oct 12, 2022, estimated cost $99K, described as “Structural work on the 6th floor, mezzanine, penthouse and roof as per plans submitted herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 30, 2022
- Alteration, filed Aug 17, 2022, estimated cost $767K, described as “Interior and exterior renovation on the 6th floor, mezzanine, penthouse and roof per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 8, 2022, estimated cost $5K, described as “Installation of new sprinkler piping and heads for temporary loop. No change to use, egress, or occupancy.”
- Alteration, filed Jun 2, 2022, estimated cost $5K, described as “Plumbing fixture removal work filed in conjunction with application M00537347. No change in Use, egress or occupancy.”
- Alteration, filed Dec 28, 2021, estimated cost $15K, described as “Adding steel dunnage, platform, and reinforcement to existing dunnage on the roof”
- Alteration, filed Nov 3, 2021, estimated cost $15K, described as “Structural changes (stair & ramp) on the 1st Floor as indicated on drawings.”
- Alteration, filed Nov 2, 2021, estimated cost $107K, described as “Architectural changes (stair & ramp) on the 1st Floor as indicated on drawings.”
- Alteration, filed Oct 14, 2021, estimated cost $1K, described as “Installation of sidewalk shed for pedestrian safety during construction. Sidewalk shed shall comply with nycc 2014 chapter 33 . No change in egress, use, or occupancy.”
- Alteration, filed Sep 28, 2021, estimated cost $41K, described as “Interior removal at 6TH floor and penthouse. No change in use, egress or occupancy.”
5 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $14,626,806
- 2026–27 tax
- $1,439,641
- Market value (city estimate)
- $32,504,003
- Taxable value
- $12,956,563
- Assessed land
- $2,025,001
- Assessed improvements
- $12,601,805
- Condo units with their own tax lots
- 30
Tax breaks
- Co-op and condo abatement, with no end date, a $26,506 credit this tax year.
Zoning
M1-5/R7X: floor area ratio 4.61 built, 5.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 24, 2026: $1,925,000, Apt 2B
- Nov 3, 2025: $3,350,000, Apt 2E
- Oct 1, 2025: $2,295,000, Apt 3D
- Jan 18, 2024: $2,200,000, Apt 4A
- Jan 12, 2022: $3,875,000, Unit PH D
- May 3, 2021: $2,288,000, Apt 3F
- Feb 23, 2021: $10,100,000, Unit PH A, sold with other lots
- Sep 12, 2019: $2,090,000, Apt 5E
- Nov 1, 2018: $2,600,000, Apt 2E
- Sep 5, 2018: $13,550,000, Unit PH A
The 10 most recent of 12 open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of SoHo-Cast Iron Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- SoHo/NoHo (City Planning 2018M0375): Zoning map change, Zoning text change, Completed, decided Aug 25, 2022. SoHo/NoHo Neighborhood Plan seeks to strengthen SoHo and NoHo as mixed-use neighborhoods and promote equity. The proposal will expand housing opportunities for New Yorkers, reduce burdens for residents and businesses, and support continued…
- 93-99 GREEN STREET; 102-106 WOOSTER STREET (City Planning P1984M1103): Completed. 84-070M: LEGALIZING AND TRANSFERRING SPACE FROM GREENE STREET TO WOOS TER STREET
- 93-99 GREENE & 102 WOOSTER STS (City Planning P1983M1095): Completed, decided Apr 9, 1986. CERT-GRANDFATHERING DETERMINATION (ZR74-782) FOR 9 UNITS-6*FLRS
- 97 GREENE ST (City Planning P1983M1373): Completed, decided Apr 9, 1986. CERT-GRANDFATHERING DETERMINATION (ZR74-782) TO LEGALIZE 2*UNITS IN A 6 STORY BLDG
- 93-99 GREENE ST, A/K/A 102-6 WOOSTER ST (City Planning P1983M1486): Completed, decided Jan 25, 1985. SPEC PERM (ZR42-14(D)I(B), 74-782 TO LEGALIZE CONVERSION TO*JOINT LIVING/WORK QTRS OF ARTISTS ON P/O 2ND & 6ND FLRS
- 93-99 GREENE ST & 102-106 WOOSTER ST (City Planning P1983M1492): Completed, decided Dec 20, 1984. CHAIRMAN'S CERT (ZR42-14D (2) (A)& (ZR42-141(C)) TO*LEGALIZE& PERMIT USE GROUP 6