# 295 Lafayette Street, Manhattan

Condominium · 6 units · built c. 1886 · Block 510, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1005107502/295-lafayette-street

More construction in Little Italy: https://umarelli.org/nyc/manhattan/little-italy.md

Every lot on block 510: https://umarelli.org/nyc/manhattan/510.md

## Building permits

- Alteration, filed Oct 14, 2026, estimated cost $120K, described as “Interior partial demolition of non loading partition of existing retail space as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 2, 2026, estimated cost $350K, described as “Interior demolition of non loading partition of existing retail space as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 24, 2026, estimated cost $75K, described as “Mechanical modifications taking place on the 5TH floor as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 18, 2026, estimated cost $20K, described as “Sprinkler modifications taking place on the 5TH floors as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 17, 2026, estimated cost $25K, described as “Proposed structural work to install steel lintel, no change in use, egress and occupancy.”
- Alteration, filed Mar 16, 2026, estimated cost $1.0M, described as “General construction modifications taking place on the 5TH floor as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 10, 2025, estimated cost $1.8M, described as “Interior renovation at 6TH and 7TH floor as per plan. Non-structural partition work. No changein use, egress and occupancy.”
- Alteration, filed Aug 18, 2025, estimated cost $100K, described as “General construction modifications taking place on the 2ND and 3RD floors as per drawings filed herewith. No change in use, egress or occupancy.”
- No Work, filed Jul 25, 2025
- Alteration, filed Jul 23, 2025, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 11, 2025, estimated cost $1.2M, described as “Proposed removal work of existing non-bearing partitions, and interior at 6TH and 7TH fl as per plan. No change in use, egress and occupancy.”
- Alteration, filed Apr 24, 2025, estimated cost $50K, described as “Alteration CO filed on 2nd floor to increase population and establish place of assembly. Installation of new restrooms to accommodate increase in occupancy on the 3rd floor. No change of egress.”
- Alteration, filed Mar 10, 2025, estimated cost $1.1M, described as “Mechanical modifications taking place on the 2ND and 3RD floor as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 7, 2025, estimated cost $100K, described as “Sprinkler modifications taking place on the 2ND and 3RD floors as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 7, 2025, estimated cost $300K, described as “Plumbing modifications taking place on the 2ND and 3RD floors as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 6, 2025, estimated cost $20K, described as “Structural modifications taking place on the 2nd' and 3rd floors as per drawing filed herewith including installation of moving partition and modification of existing communicating stair. No change in use, egress or occupancy.”
- Alteration, filed Mar 6, 2025, estimated cost $3.1M, described as “General construction modifications taking place on the 2ND and 3RD floors as per drawings filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jan 21, 2025, estimated cost $93K, described as “Mechanical work proposed for an existing apartment. No change to use, occupancy or egress.”
- Alteration, filed Jan 9, 2025, estimated cost $24K, described as “Sprinkler work proposed for an existing apartment. No change to use, occupancy or egress.”
- Alteration, filed Dec 12, 2024, estimated cost $100K, described as “Plumbing work proposed for an existing apartment. No change to use, occupancy or egress.”
- Alteration, filed Nov 15, 2024, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Nov 1, 2024, estimated cost $538K, described as “Minor interior renovation proposed for an existing apartment. No change in use, occupancym, egress or zoning under this application.”
- Alteration, filed Jun 21, 2024, estimated cost $40K, described as “2nd & 3rd Floor Demo”
- Alteration, filed May 14, 2024, estimated cost $275K, described as “Modification of existing sprinkler system. No change to use, egress or occupancy.”
- Alteration, filed May 14, 2024, estimated cost $356K, described as “Installation of plumbing fixtures and related piping. No change to use, egress or occupancy.”

27 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1005107502/295-lafayette-street.

## Property taxes

- Assessment: $53,310,606
- 2026–27 Tax: $5,222,567
- Market value (city estimate): $118,468,009
- Taxable value: $47,106,123
- Assessed land: $4,500,005
- Assessed improvements: $48,810,601
- Condo units with their own tax lots: 7

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $24,917 credit this tax year.

## Zoning

C6-3: floor area ratio 8.43 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jul 27, 2026: $42,000,000, Apt 9C
- May 23, 2024: $32,500,000, Apt 8C
- May 5, 2022: $22,000,000, Apt 8B
- Dec 28, 2021: $35,000,000, Unit PH
- May 29, 2019: $18,000,000, Apt 9A
- Apr 2, 2019: $18,000,000, Apt 8B
- Jun 21, 2016: $17,821,375, Apt 8A
- Feb 5, 2016: $28,511,000, Apt 9C

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Puck Building (Individual Landmark). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- PUCK BUILDING (City Planning P1989M1007): Completed. 89-197M: PROJECT ENTAILS A MODIFICATION OF USE FOR THE GROUND, LOWER AND SUB-BASEMENT LEVELS WITHIN THE PUCK BUILDING.
- PUCK BUILDING (City Planning P1996M0171): Completed, decided May 19, 1997. 92DCP614M: ULURP-RELATED SPECIAL PERM (74-711) FOR A MODIFICATION OF PERMITTED USE AT THE GROUND FLR & P/O 7TH & 9TH FLOORS FOR CATERING/BANQUET FACILITIES
- PETER, PAUL & PUCK LAMPPOSTS (City Planning P1984M0848): Completed, decided Jun 8, 1988. CONSENT TO CONST, MAINTAIN & USE 2 LAMPPOSTS & AN ELECTRICAL\*CONDUIT ON & UNDER THE SIDEWALK
- PUCK BLDG (City Planning P1983M0783): Completed, decided Jun 16, 1983. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING\*COURSE LA; Additional LPC #(s): 322

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology