151 Mercer Street, Manhattan
Commercial · built 2017 · Block 513, Lot 31.
Building permits
- Alteration, filed May 1, 2026, estimated cost $3K, described as “New flashing on roof as per plans filed herewith. no change in egress use or occupancy.”
- Alteration, filed Sep 8, 2021, estimated cost $3K, described as “Install storefront awning with no copy. No changes to occupancy, use or egress,.”
- Alteration, filed Sep 2, 2021, described as “Install non-illuminated double faced blade sign on wall (tory burch)”
- Alteration, filed Sep 2, 2021, estimated cost $400, described as “Install illuminated wall sign (tory burch)”
- Alteration, filed Feb 24, 2021, estimated cost $1K, described as “No-work application filed for energy code compliance in conjunction with job application number 140944806”
- Alteration, filed Sep 18, 2020, estimated cost $10K, described as “Plumbing work as shown on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Sep 18, 2020, estimated cost $45K, described as “Modifications to an existing sprinkler system as shown on plans filed herewith.”
- Alteration, filed Sep 18, 2020, estimated cost $150K, described as “Mechanical work as shown on plans, no change to use, egress or occupancy.”
- Alteration, filed Mar 25, 2019, estimated cost $15K, described as “Installation of scaffolding at the adjacent property (149 mercer street) during new building construction, filed separately at 151 mercer street. Scaffolding shall comply with chapter #33 of the NYC building code. No change in use,…”
- Alteration, filed Jan 25, 2019, estimated cost $15K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 16, 2019, estimated cost $72K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 11, 2018, estimated cost $32K, described as “Installation of plywood fence as per drawings. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
Property taxes
- Assessment
- $6,052,950
- 2026–27 tax
- $611,800
- Market value (city estimate)
- $13,451,000
- Taxable value
- $5,639,750
- Assessed land
- $485,550
- Assessed improvements
- $5,567,400
Zoning
M1-5/R7X: floor area ratio 3.48 built, 5.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of SoHo-Cast Iron Historic District (Historic District). 26 Landmarks Preservation Commission permits are on file.
Board and land use applications
- SoHo/NoHo (City Planning 2018M0375): Zoning map change, Zoning text change, Completed, decided Aug 25, 2022. SoHo/NoHo Neighborhood Plan seeks to strengthen SoHo and NoHo as mixed-use neighborhoods and promote equity. The proposal will expand housing opportunities for New Yorkers, reduce burdens for residents and businesses, and support continued…