# 36 Bleecker Street, Manhattan

Condominium · 19 units · built c. 1920 · Block 521, Lot 7505.

On Umarelli: https://umarelli.org/nyc/1005217505/36-bleecker-street

More construction in Greenwich Village: https://umarelli.org/nyc/manhattan/greenwich-village.md

Every lot on block 521: https://umarelli.org/nyc/manhattan/521.md

## Building permits

- Alteration, filed Oct 20, 2026, estimated cost $4K, described as “Installation of temporary storage of materials as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 10, 2026, estimated cost $4K, described as “Installation of temporary beta max hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 31, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jul 29, 2026, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 16, 2026, estimated cost $68K, described as “Masonry facade repairs as per plans. No change to use, occupancy or egress.”
- Alteration, filed Aug 29, 2025, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 15, 2025, estimated cost $110K, described as “Exterior and interior repairs due to adjacent construction per plans submitted herewith. Work to include brick replacement, cast iron repairs, window and door work. No change in use, egress or occupancy.”
- Alteration, filed Mar 31, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jul 27, 2022, estimated cost $605K, described as “Repair and re-structure east vault and repairs to north vault in an old-code residential building. Install new storage units in cellar. No change to occupancy / use, egress or fire protection under this application.”
- Alteration, filed Jul 27, 2022, estimated cost $35K, described as “Install temporary shoring in sidewalk vault per plans. No change to occupancy / use, egress or fire-protection under this application.”

## Property taxes

- Assessment: $12,918,598
- 2026–27 tax: $1,606,945
- Market value (city estimate): $28,708,001
- Taxable value: $12,918,598
- Assessed land: $782,999
- Assessed improvements: $12,135,599
- Condo units with their own tax lots: 19

## Zoning

C6-2: floor area ratio 5.42 built, 6.02 allowed by base zoning.

## Recent sales

- Jul 22, 2026: $8,600,000, Apt M1
- Jun 10, 2026: $9,600,000, Apt 3D
- Dec 30, 2025: $3,800,000, Apt 3C
- Sep 13, 2024: $8,400,000, Apt M1
- Jul 23, 2024: $18,500,000, Unit PHA
- May 17, 2023: $8,400,000, Apt 5B
- Jul 25, 2022: $5,867,000, Apt 4B
- Jun 22, 2022: $10,562,500, Apt 5A
- Jun 21, 2022: $6,015,000, Apt 3B
- Mar 18, 2022: $3,750,000, Apt 3C

The 10 most recent of 17 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of NoHo East Historic District (Historic District). 17 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- 36 Bleecker Street (City Planning P2012M0586): Completed, decided Jul 19, 2013. Authorization to modify height and setback pursuant to ZR Section 109-514.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
