# 200 Mercer Street, Manhattan

Co-op · 28 units · built c. 1870 · Block 523, Lot 32.

On Umarelli: https://umarelli.org/nyc/1005230032/200-mercer-street

More construction in Greenwich Village: https://umarelli.org/nyc/manhattan/greenwich-village.md

Every lot on block 523: https://umarelli.org/nyc/manhattan/523.md

## Building permits

- Alteration, filed Oct 8, 2025, estimated cost $5K, described as “Installation of a temporary scaffold as per plans during general construction work. No change in use, egress or occupancy. Scaffold to comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Apr 10, 2024, estimated cost $80K, described as “Remodel of existing bathrooms and modification of non-load bearing partition with relocation of interior door. No change to occupancy use or egress.”
- Alteration, filed Aug 24, 2022, estimated cost $230K, described as “Interior general construction renovation of apartment 4E on the 4TH floor including partitions, fixtures, and finishes as per plans filed herewith. No change of use, egress, or occupancy.”
- Alteration, filed Aug 24, 2022, estimated cost $49K, described as “Plumbing work in conjunction with renovation of apartment 4E on the 4TH floor. No change of use, egress, or occupancy.”
- Alteration, filed Aug 10, 2022, estimated cost $1K, described as “Installation of overhead protection in accordance with nycc 2014 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Apr 6, 2022, estimated cost $20K, described as “Interior renovation of apartment 4E to acquire a portion of apartment 4F/5F on the 4TH floor including the removal and installation of partitions, fixtures, and finishes as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Feb 14, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”

## Building history

- Major Renovation — Conversion, filed Jun 28, 1993, permit issued - entire job/work, 28 units added, 5 stories, described as “New bedroom to be added on the fourth in ap. 4A. Additional construction on fifth flr mezzanine of apt. 4A.”
- Major Renovation — Conversion, filed Dec 24, 1990, signed off May 14, 1992, 28 units added, 5 stories, described as “Install partitions. Renovate kitchen &amp; toilet. No change in egress, use or occupancy is involved under this appl ication. Structure stability will not b affected during construction oparations.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $6,739,200
- 2026–27 Tax: $615,268
- Market value (city estimate): $14,976,000
- Taxable value: $5,732,820
- Assessed land: $999,000
- Assessed improvements: $5,740,200

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $97,838 credit this tax year.

## Zoning

C6-2: floor area ratio 3.57 built, 6.02 allowed by base zoning.

## Recent sales

- Apr 21, 2026: $3,750,000
- Mar 25, 2026: $3,100,000
- Mar 16, 2026: $2,250,000
- May 5, 2025: $3,300,000
- Apr 24, 2025: $5,625,000
- Mar 6, 2025: $4,050,000
- Jun 5, 2024: $76,968
- Oct 27, 2023: $3,308,250
- Mar 27, 2023: $3,375,000
- Jun 2, 2022: $935,000

The 10 most recent of 16 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of NoHo Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- NATIONAL WHOLESALE LIQUIDATORS (City Planning P1996M0302): Completed, decided May 6, 1996. 95DCP063M: TO ALLOW A CONSOLIDATION OF EXISTING RETAIL SPACE ON A SITE LOCATED ON THE EAST SIDE OF BROADWAY BETWEEN HOUSTON STREET AND BLEECKER STREET IN THE NOHO SECTION OF MANHATTAN

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
