# 644 Broadway, Manhattan

Co-op · 14 units · built c. 1891 · Block 529, Lot 1.

On Umarelli: https://umarelli.org/nyc/1005290001/644-broadway

More construction in Greenwich Village: https://umarelli.org/nyc/manhattan/greenwich-village.md

Every lot on block 529: https://umarelli.org/nyc/manhattan/529.md

## Building permits

- Alteration, filed Oct 8, 2026, estimated cost $25K, described as “Installation of new structural steel for the framing of a material lift shaft at the first floor, cellar, and sub-cellar levels. All as per plan. No change in occupancy, use, or egress.”
- Alteration, filed Oct 8, 2026, estimated cost $8K, described as “New concrete footings for structural steel posts at sub-cellar level to support the structural framing of a material lift shaft. All as per plan. No change in occupancy, use, or egress.”
- Alteration, filed Oct 7, 2026, estimated cost $400K, described as “General construction in cellar & 1ST floor cafe space for new dumbwaiter, minor interior demo, renovations & finishes as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 26, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Sep 17, 2023, estimated cost $10K, described as “Conversion of existing eating and drinking establishment to retail.”
- Alteration, filed Aug 29, 2023, estimated cost $145K, described as “Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 29, 2023, estimated cost $2.7M, described as “General Construction as shown on plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Aug 28, 2023, estimated cost $45K, described as “Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Aug 28, 2023, estimated cost $35K, described as “Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 16, 2023, estimated cost $16K, described as “Sprinkler/Standpipe work as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 16, 2023, estimated cost $282K, described as “Demolition/general construction as shown on plans filed herewith, No change in use, egress or occupancy.”
- Alteration, filed Jun 16, 2023, estimated cost $15K, described as “Mechanical work as shown on plans filed herewith. No chance in use, egress or occupancy,”
- Alteration, filed Jun 16, 2023, estimated cost $35K, described as “Structural work as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jun 16, 2023, estimated cost $15K, described as “Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 15, 2023, estimated cost $12K, described as “Interior renovation in apt 8W filed in conjunction with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Feb 1, 2023, estimated cost $175K, described as “Installation of splits systems on the cellar, 1ST floor, and roof with a total capacity of 50 tons. No change to egress, use, or occupancy.”
- Alteration, filed Jan 20, 2023, estimated cost $4K, described as “Installation of temporary betamax hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 19, 2023, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 26, 2022, estimated cost $190K, described as “Interior renovation of existing fifth floor apartment 5W as per plans. There is no increase in size or change in use, occupancy or egress under this application.”
- Alteration, filed Sep 26, 2022, estimated cost $39K, described as “Interior renovation of existing fifth floor apartment 5W as per plans. There is no increase in size or change in use, occupancy or egress under this application.”
- Alteration, filed Jun 17, 2022, estimated cost $25K, described as “Interior renovation of existing fifth floor apartment 5W as per plans. There is no increase in size or change in use, occupancy or egress under this application.”
- Alteration, filed Jun 13, 2022, estimated cost $35K, described as “Replacement of existing AC unit, indoor and outdoor unit”
- Alteration, filed Oct 26, 2021, estimated cost $25K, described as “Filing herewith for the demolition of exisitng mechanical systems and installation of two (2) new fan coil units, two (2) condensing units reated and refrigerant piping”
- Alteration, filed Aug 26, 2020, described as “Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 26, 2020, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”

## Property taxes

- Assessment: $7,132,950
- 2026–27 tax: $736,213
- Market value (city estimate): $15,851,000
- Taxable value: $6,699,320
- Assessed land: $495,000
- Assessed improvements: $6,637,950

## Tax breaks

- Co-op and condo abatement, with no end date, a $97,115 credit this tax year.

## Zoning

M1-5/R9A: floor area ratio 7.59 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jul 7, 2026: $3,950,000
- Apr 23, 2026: $5,400,000
- Mar 18, 2022: $3,450,000
- Dec 30, 2021: $5,400,000
- Nov 29, 2021: $2,475,000
- Mar 25, 2021: $3,200,000
- Mar 12, 2020: $2,350,000, Apt 7E
- Jul 18, 2016: $2,750,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of NoHo Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- SoHo/NoHo (City Planning 2018M0375): Zoning map change, Zoning text change, Completed, decided Aug 25, 2022. SoHo/NoHo Neighborhood Plan seeks to strengthen SoHo and NoHo as mixed-use neighborhoods and promote equity. The proposal will expand housing opportunities for New Yorkers, reduce burdens for residents and businesses, and support continued…