44 West 4th Street, Manhattan
College · built 1990 · Block 535, Lot 1.
Building permits
- Alteration, filed Jul 1, 2026, described as “Ira facade inspection/ repairs”
- Alteration, filed Jul 1, 2026, described as “Ira facade inspection/ repairs”
- Alteration, filed Jun 2, 2026, estimated cost $5K, described as “Storage of material / equipment on top of heavy duty sidewalk shed. Storage shall not exceed 25 psf. Shed filed under separate application. Storage shall comply with CH#33 of the NYC bldg code. No change in use, occupancy or egress under…”
- Alteration, filed Jun 2, 2026, estimated cost $3K, described as “Storage of material / equipment on top of heavy duty sidewalk shed. Storage shall not exceed 25 psf. Shed filed under separate application. Storage shall comply with CH#33 of the NYC bldg code. No change in use, occupancy or egress under…”
- Alteration, filed May 30, 2026, estimated cost $48K, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 29, 2026, estimated cost $93K, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 12, 2026, estimated cost $17K, described as “Exterior facade repairs and maintenance as necessary. All work as per plans filed. No change in use, occupancy or egress proposed under this application.”
- Alteration, filed May 12, 2026, estimated cost $366K, described as “Exterior facade repairs and maintenance as necessary. All work as per plans filed. No change in use, occupancy or egress proposed under this application.”
- Alteration, filed May 8, 2026, estimated cost $550K, described as “Filing here with general construction to include interior renovation and interior demo to an existing space located on the 09th floor as per plans”
- Alteration, filed May 7, 2026, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Jun 23, 2025, estimated cost $240K, described as “Installation of temporary construction fence/enclosure system as per drawings. Fence enclosure shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application”
- Alteration, filed Jun 23, 2025, estimated cost $230K, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 11, 2025, estimated cost $3.0M, described as “General construction to accommodate plaza reconstruction work including removal/installation of finish pavers/supports, install guard booth, installation of landscaped/seating areas, reconfiguration of handicap access ramp as per plans…”
- Alteration, filed Jun 11, 2025, estimated cost $125K, described as “General construction associated with interior modifications as indicated on plans submitted herewith.”
- Alteration, filed May 21, 2025, estimated cost $350K, described as “Filing herewith general construction to include interior renovation and interior demo to an existing space located on the 5th fl as per plans”
- No Work, filed May 19, 2025
- Alteration, filed May 8, 2025, estimated cost $100K, described as “Removal and installation of interior non-load bearing partitions and related finishes to an existing space (7th thru 9th Floor) as per plans. There will be no change in use, egress, or occupancy.”
- Alteration, filed Oct 11, 2024, estimated cost $250K, described as “Filing herewith general construction to include interior renovation and interior demo to an existing space located on 4th and 10th fl”
- Alteration, filed Oct 1, 2024, estimated cost $150K, described as “Installaton of temporary protective fences as per plans herewith filed.”
- Alteration, filed Jul 29, 2024, described as “Material hoist”
- Alteration, filed May 31, 2024, estimated cost $200K, described as “Mechanical modifications as per plans”
- Alteration, filed May 24, 2024, estimated cost $150K, described as “Filing herewith general construction to include interior renovation and demo of an existing commercial space as per plans.”
- Alteration, filed May 23, 2024, estimated cost $250K, described as “Filing herewith general construction to include interior renovation and interior demo to an existing space located on 10th fl”
- Alteration, filed Apr 25, 2024, estimated cost $30K, described as “Temporary protective fence as indicated on plans submitted herewith.”
- Alteration, filed Oct 3, 2023, estimated cost $600K, described as “General construction to include interior renovation and minor interior demo to an existing space located on the 6th fl”
50 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $45,073,350
- Market value (city estimate)
- $100,163,000
- Taxable value
- $0
- Assessed land
- $6,106,050
- Assessed improvements
- $38,967,300
Tax breaks
- Nonprofit exemption (college or university), with no end date, about $4,889,557 a year below the full tax.
Zoning
R7-2: floor area ratio 5.97 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.