393 Lafayette Street, Manhattan
Commercial · built c. 1885 · Block 544, Lot 1.
Building permits
- Alteration, filed Feb 11, 2026, estimated cost $85K, described as “Facade repairs and railing installation. No change in use, egress or occupancy.”
- Alteration, filed Jan 12, 2026, estimated cost $245K, described as “Replacement of 3 condensing units on the roof and 6 air handler units indoors with a total capacity of 360,000 btu/h. No change to egress, use, or occupancy.”
- Alteration, filed Dec 11, 2025, described as “IRA Facade inspections as per the plans”
- Alteration, filed Jun 24, 2025, estimated cost $306K, described as “Minor partition work with general carpentry. No change to use, bulk or egress”
- Alteration, filed Jun 16, 2025, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 16, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Apr 25, 2025, estimated cost $23K, described as “Removal and installation of new non-loadbearing partitions. No change to use, egress or occupancy”
- Alteration, filed Apr 25, 2025, estimated cost $500K, described as “Interior renovations consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Aug 12, 2024, estimated cost $180K, described as “Replacement of historic windows at selected openings with fire rated windows. No change to use, egress, or occupancy.”
- Alteration, filed May 30, 2023, estimated cost $1K, described as “Installation of supported scaffold as indicated on the attached drawings. There are no changes in use, egress or occupancy”
- Alteration, filed May 30, 2023, estimated cost $1K, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed May 21, 2021, estimated cost $238K, described as “Restoration of facade elements. No change in use, egress or occupancy.”
- Alteration, filed Mar 2, 2020, estimated cost $1K, described as “Installation of sidewalk shed and pipe scaffold in accordance with nycc 2014 chapter 33. No change in egress, use, or occupancy.”
Building history
- Alteration, filed Oct 8, 2015, permit issued - entire job/work, described as “Filing alt 1 application to change the occupancy minor work to include new egress door to existing fire escape”
- Alteration, filed Feb 22, 1999, signed off Apr 4, 2001, described as “This application is being filed for the conversion of the 1st floor commercial space into one restaurant and one meeting hall.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $12,499,650
- 2026–27 Tax
- $1,357,337
- Market value (city estimate)
- $27,777,000
- Taxable value
- $12,499,650
- Assessed land
- $1,170,000
- Assessed improvements
- $11,329,650
Zoning
M1-5/R9A: floor area ratio 6.97 built, 7.52 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of DeVinne Press Building: Individual Landmark, NoHo Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- SoHo/NoHo (City Planning 2018M0375): Zoning Map Change, Zoning Text Change, Completed, decided Aug 25, 2022. SoHo/NoHo Neighborhood Plan seeks to strengthen SoHo and NoHo as mixed-use neighborhoods and promote equity. The proposal will expand housing opportunities for New Yorkers, reduce burdens for residents and businesses, and support continued…