31 West 4th Street, Manhattan
College · built c. 1900 · Block 546, Lot 30.
Building permits
- Alteration, filed Apr 2, 2025, estimated cost $86K, described as “Herewith filing for interior partitions and doors modification as per plans. No change to use, egress or occupancy under this application.”
- Alteration, filed Apr 6, 2023, estimated cost $5K, described as “Install 8'-0" high temporary construction fence @ 1ST floor sidewalk level open space. No change in use, egress or occupancy.”
- Alteration, filed Apr 6, 2023, estimated cost $193K, described as “Install plumbing fixtures and modify existing sprinkler system for a new restaurant on 1ST floor, in conjunction with job# M00846051. No change in use, egress or occupancy.”
- Alteration, filed Apr 5, 2023, estimated cost $80K, described as “Installation of mechanical system for a new restaurant in conjunction with job# M00846051 . No change in use, egress or occupancy.”
- Alteration, filed Mar 31, 2023, estimated cost $172K, described as “It is proposed to renovate existing 1st floor commercial space for a new eating & drinkingestablishment. Install interior partitions, finishes, hung ceiling. Plumbing & HVAC kitchen exhaust to be filed separately. No change in use, egress,…”
- Alteration, filed Apr 16, 2020, estimated cost $195, described as “Erect non-illuminated double faced blade sign”
- Alteration, filed Apr 16, 2020, estimated cost $3K, described as “Erect illuminated wall sign”
- Alteration, filed Apr 16, 2020, estimated cost $195, described as “Erect non-illuminated double faced blade sign”
- Alteration, filed Apr 16, 2020, estimated cost $6K, described as “Erect illuminated wall sign”
- Alteration, filed Feb 27, 2020, estimated cost $50K, described as “Modification to existing plumbing system and associated piping as per plans filed herewith. there will be no change in use, egress or occupancy.”
- Alteration, filed Feb 27, 2020, estimated cost $15K, described as “Modifications to existing sprinkler system and associated piping. there will be no change in use, egress or occupancy.”
- Alteration, filed Feb 27, 2020, estimated cost $95K, described as “HVAC modifications with new Air Handling Units and associated ductwork as per plans filed herewith. There will be no change in use, egress or occupancy.”
- Alteration, filed Aug 23, 2019, estimated cost $2K, described as “Install non-illuminated non advertising accessory sign as per plans. No change to use, egress or occupancy under this application.”
- Alteration, filed May 30, 2019, estimated cost $2K, described as “Install non-illuminated non advertising accessory sign as per plans. No change to use, egress or occupancy under this application.”
- Alteration, filed Mar 27, 2018, estimated cost $52K, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 22, 2018, estimated cost $25K, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $1,693,800
- 2026–27 Tax
- $74,688
- Market value (city estimate)
- $3,764,000
- Taxable value
- $688,496
- Assessed land
- $297,900
- Assessed improvements
- $1,395,900
Tax breaks
- Nonprofit exemption (college or university), with no end date, about $100,513 a year below the full tax.
Zoning
R7-2: floor area ratio 4.00 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- NYU CORE, MERCER ST., BLEECKER ST. (City Planning P2012M0059): Completed, decided Jul 31, 2012. 11DCP121M: NYU IS SEEKING A NUMBER OF DISCRETIONARY ACTONS IN CONNECTIO N W/ THE PROPOSED EXPANSION OF NYU FACILITIES AS ITS ACADEMI C CORE NEAR WASHINGTON SQUARE