# 707 Broadway, Manhattan

College · built 1971 · Block 546, Lot 35.

On Umarelli: https://umarelli.org/nyc/1005460035/707-broadway

More construction in Greenwich Village: https://umarelli.org/nyc/manhattan/greenwich-village.md

Every lot on block 546: https://umarelli.org/nyc/manhattan/546.md

## Building permits

- Alteration, filed May 5, 2026, estimated cost $30K, described as “Installation of sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 9, 2026, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Mar 4, 2026, estimated cost $142K, described as “Exterior facade repairs and maintenance as necessary. All work as per plans filed. No change in use, occupancy or egress proposed under this application.”
- Alteration, filed Jan 28, 2026, estimated cost $750K, described as “Application filed for Sidewalk Vault repair/reconstruction as per plans herewith. Steel and concrete work are related to this project. No Change in Use, Egress or Occupancy”
- Alteration, filed Oct 7, 2025, estimated cost $150K, described as “Herewith filing for split unit system as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Dec 17, 2024, estimated cost $900K, described as “Filing herewith general construction to include interior renovation as per plans”
- Alteration, filed Jul 9, 2024, estimated cost $1.0M, described as “Filing herewith general construction to include interior renovation as per plans”
- Alteration, filed Oct 12, 2023, estimated cost $350K, described as “Filing herewith general construction to include interior demo on 8th fl of an existing building as per plans”
- Alteration, filed Jul 6, 2022, estimated cost $180K, described as “Mechanical modification of chill water piping, exhaust fan, split system, duct work”
- Alteration, filed Jun 30, 2022, estimated cost $38K, described as “Interior renovation of 2nd floor meg lab”
- Alteration, filed Apr 3, 2022, described as “Installation of sidewalk shed as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Feb 14, 2022, estimated cost $100K, described as “Filing herewith application for structural work on 5th floor. No change in use, egress or occupancy.”
- Alteration, filed Jan 12, 2022, estimated cost $100K, described as “Filing herewith modifications to existing sprinkler system. No change in use, egress or occupancy.”
- Alteration, filed Jan 12, 2022, estimated cost $100K, described as “Filing herewith application for Plumbing modifications as per plans submitted herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 1, 2021, estimated cost $400K, described as “Filing herewith application for interior renovations of 4th and 5th floor. No change in use, egress or occupancy.”
- Alteration, filed Nov 2, 2021, estimated cost $50K, described as “Interior mechanical demolition including ductwork removal.”
- Alteration, filed Jan 21, 2020, estimated cost $15K, described as “Filing herewith Sprinkler demolition and temporary loop. No change in use, egress or occupancy.”
- Alteration, filed Jan 21, 2020, estimated cost $10K, described as “Interior plumbing demolition on 005 floor. No change in sue, egress or occupancy.”
- Alteration, filed Nov 30, 2017, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $9,638,550
- Market value (city estimate): $21,419,000
- Taxable value: $0
- Assessed land: $1,890,000
- Assessed improvements: $7,748,550

## Tax breaks

- Nonprofit exemption (college or university), with no end date, about $1,045,590 a year below the full tax.

## Zoning

C6-2: floor area ratio 9.48 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of NoHo Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
