# 51 Astor Place, Manhattan

Commercial · built 2012 · Block 554, Lot 35.

On Umarelli: https://umarelli.org/nyc/1005540035/51-astor-place

More construction in Greenwich Village: https://umarelli.org/nyc/manhattan/greenwich-village.md

## Building permits

- Alteration, filed Oct 8, 2026, estimated cost $20K, described as “Sprinkler work for retail space for Intuit on 1st floor”
- Alteration, filed Oct 8, 2026, estimated cost $12K, described as “Structural work for retail space for Intuit on 1st floor”
- Alteration, filed Oct 8, 2026, estimated cost $695K, described as “General construction for retail space for Intuit on 1st floor”
- Alteration, filed Oct 8, 2026, estimated cost $212K, described as “Mechanical work for retail space for Intuit on 1st floor”
- Alteration, filed Sep 1, 2026, estimated cost $150K, described as “Interior demolition and construction for white box on 8th floor”
- Alteration, filed Aug 28, 2026, estimated cost $140K, described as “Plumbing work for Intuit space on 7th floor”
- Alteration, filed Aug 28, 2026, estimated cost $10K, described as “Alt-CO to change the occupancy of Level 7 for business spaces. No Enlargement proposed. Scope of work associated with permit is limited to the addition of an egress door as shown on A-107 and an increase to the maximum floor occupancy”
- Alteration, filed Aug 28, 2026, estimated cost $1.6M, described as “Mechanical work for Intuit space on 7th floor”
- Alteration, filed Aug 28, 2026, estimated cost $210K, described as “Sprinkler work for Intuit space on 7th floor”
- Alteration, filed Aug 26, 2026, estimated cost $1.4M, described as “General construction for Intuit space on 7th floor”
- Alteration, filed Aug 26, 2026, estimated cost $250K, described as “Structural work to include steel to support slab opening and new stair install for Intuit space on 7th floor”
- Alteration, filed Aug 25, 2026, estimated cost $20K, described as “Plumbing work during interior demo and white box construction on 8th floor”
- Alteration, filed Aug 25, 2026, estimated cost $68K, described as “General construction for Perceptive Life on 10th floor”
- Alteration, filed Aug 25, 2026, estimated cost $30K, described as “Sprinkler work with temp loop during interior demo and white box construction on 8th floor”
- Alteration, filed Aug 25, 2026, estimated cost $25K, described as “Mechanical work during interior demo and white box construction on 8th floor”
- Alteration, filed Aug 20, 2026, estimated cost $10K, described as “Mechanical work for Perceptive Life on 10th floor”
- Alteration, filed Aug 6, 2026, estimated cost $1.6M, described as “General construction for Xantium Investments on 12th floor”
- Alteration, filed Aug 4, 2026, estimated cost $93K, described as “Plumbing work for Xantium Investments on 12th floor”
- Alteration, filed Aug 4, 2026, estimated cost $350K, described as “Mechanical work for Xantium Investments on 12th floor”
- Alteration, filed Aug 4, 2026, estimated cost $63K, described as “Sprinkler work for Xantium Investments on 12th floor”
- No Work, filed Mar 13, 2026
- Alteration, filed Mar 13, 2026, estimated cost $150K, described as “Interior demolition and construction for white box on 9th floor”
- Alteration, filed Mar 12, 2026, estimated cost $20K, described as “Mechanical work during interior demo and white box construction on 9th floor”
- Alteration, filed Mar 12, 2026, estimated cost $35K, described as “Sprinkler work during interior demo and white box construction on 9th floor”
- Alteration, filed Mar 12, 2026, estimated cost $15K, described as “Plumbing work during interior demo and white box construction on 9th floor”

77 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1005540035/51-astor-place.

## Property taxes

- Assessment: $113,000,000
- Market value (city estimate): $251,111,100
- Taxable value: $0
- Assessed land: $6,480,000
- Assessed improvements: $106,520,000

## Zoning

C6-3: floor area ratio 10.72 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or special permit (Board of Standards and Appeals 2016-4328-BZ): Variance or special permit, Granted, filed Nov 10, 2016, decided Oct 31, 2017. Special Permit (§73-36) to permit the operation a Physical Cultural Establishment (Orangetheory Fitness) on the first and cellar floors of the existing building. C6-3 zoning district.
- Variance or special permit (Board of Standards and Appeals 2016-4231-BZ): Variance or special permit, Granted, filed Aug 3, 2016, decided May 16, 2017. Special Permit (§73-36) to permit the legalization of the operation of a physical culture establishment (Flywheel) located within a portion of the cellar of an existing building. C6-3 zoning district.
- COOPER UNION GLSD (City Planning P2003M0002): Completed, decided Dec 5, 2010. 01DCP061M: TO ALLOW COOPER UNION TO MODERNIZE ITS ACADEMIC FACILITIES A ND PERMIT THE DEVELOPMENT OF NEW COMMERCIAL SPACE ORIENTED T OWARD THE TECHNOLOGY AND DESIGN INDUSTRIES
- COOPER UNION GLSD (City Planning P2007M0403): Completed, decided Dec 5, 2010. 01DCP061M: TO ALLOW COOPER UNION TO MODERNIZE ITS ACADEMIC FACILITIES A ND PERMIT THE DEVELOPMENT OF NEW COMMERCIAL SPACE ORIENTED T OWARD THE TECHNOLOGY AND DESIGN INDUSTRIES

## In the news

[51 Astor Place Receives $62 Million Investment In East Village, Manhattan](https://newyorkyimby.com/2026/01/51-astor-place-receives-62-million-investment-in-east-village-manhattan.html), New York YIMBY, Jan 24, 2026.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
